Data center buildProposed

Chirisa PNJ-01 / PNJ-02 Piscataway Campus

ChirisaPiscataway, Middlesex County, NJUpdated

Chirisa has proposed a 90 MW data center in Middlesex County, New Jersey (proposed). One source reports this facility in the Kapwork Grow tracker.

Capacity
90 MW
Expected completion
2027

Who's on this build

Named in the cited sources. No source reports who builds it.

Schedule

Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.

  1. next year

    Expected completionPlanned

  2. Today

    Proposed

    Last material change Sep 24, 2026.

  3. ~3 yr ago

    Announced

Reported updates without an event date

Record quality

Datasets
1
Summary
From published records
Source as of
Last material change

Site and infrastructure

SC Server CountryKW Kapwork Grow tracker record

Status

Operator
ChirisaOperator · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0967
Stage
ProposedStage · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0967
Facility type
EnterpriseFacility type · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 230339089722919

Scale

Reported capacity
90 MWReported capacity · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0967

Reported dates

Announced
2024-01Announced · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0967
Expected completion
2027Expected completion · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0967

Site

City
PiscatawayCity · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0967
County
Middlesex CountyCounty · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0967
State
New JerseyState · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0967

Sources, method and limits

Show 1 sourceHide

What each source reports

What each source reports
DatasetReported nameReported statusReported MW
Server CountryChirisa PNJ-01 / PNJ-02 Piscataway CampusProposed90 MW

Sources and evidence

  1. SC
    Server Country project record (CC BY 4.0)As of: Sep 24, 2026 · Record: 0967
  2. KW

Limitations and interpretation

  • This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
  • Sources on this record: Server Country, https://servercountry.org/data/ (CC BY 4.0). Every source is licensed for commercial use with attribution.
  • An announced or permitted build is not a contract, an open bid or a purchase order.
  • Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.

Cite or correct this record

Kapwork Grow, “Chirisa PNJ-01 / PNJ-02 Piscataway Campus”, https://kapwork.com/grow/directory/datacenters/chirisa-pnj-01-pnj-02-piscataway-campus-nj-dc_d17dff9eee27, materially updated Sep 24, 2026.

Report an error in this record and we will check it against the cited sources.

An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.