FirstLight Bedford Data Center (formerly ColoSpace)

FirstLightBedford, Hillsborough County, NHUpdated

FirstLight is expanding a data center in Hillsborough County, New Hampshire (expanding). One source reports this facility in the Kapwork Grow tracker.

Building area
7,250 sq ft

Who's on this build

Named in the cited sources. No source reports who builds it.

  • Operator

    FirstLight

Timeline

Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.

  1. Today

    Expanding

    Last material change Sep 24, 2026.

  2. 6 mo ago

    Announced

  3. 6 mo ago

    Reported as announced

    Event date: · First observed: Not reported

  4. ~14 yr ago

    Construction start

Reported updates without an event date

Record quality

Datasets
1
Summary
From published records
Source as of
Last material change

Site and infrastructure

SC Server CountryKW Kapwork Grow tracker record

Status

Operator
FirstLightOperator · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0323
Stage
ExpandingStage · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0323
Facility type
AI data centerFacility type · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 248007280391159

Scale

Reported building area
7,250 sq ftReported building area · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 248007280391159

Reported dates

Announced
2026-03-10Announced · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0323Reported date — see the source for the event evidenced.
Construction start reported
2012-10Construction start reported · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0323

Site

City
BedfordCity · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0323
County
Hillsborough CountyCounty · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0323
State
New HampshireState · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0323

Power and cooling

AI workload
AI or machine-learning workload reportedAI workload · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 248007280391159

Sources, method and limits

Show 1 sourceHide

What each source reports

What each source reports
DatasetReported nameReported statusReported MW
Server CountryFirstLight Bedford Data Center (formerly ColoSpace)ExpandingNot reported

Sources and evidence

  1. SC
    Server Country project record (CC BY 4.0)As of: Sep 24, 2026 · Record: 0323
  2. KW

Limitations and interpretation

  • This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
  • Sources on this record: Server Country, https://servercountry.org/data/ (CC BY 4.0). Every source is licensed for commercial use with attribution.
  • An announced or permitted build is not a contract, an open bid or a purchase order.
  • Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.

Cite or correct this record

Kapwork Grow, “FirstLight Bedford Data Center (formerly ColoSpace)”, https://kapwork.com/grow/directory/datacenters/firstlight-bedford-data-center-formerly-colospace-nh-dc_e18fb1d973f7, materially updated Sep 24, 2026.

Report an error in this record and we will check it against the cited sources.

An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.