Data center buildProposed2 of 2 datasets agree

Gibraltar Data Center (former McLouth Steel site)

Raeden (with Cal Realty / Ferragon Corp.)Gibraltar, Wayne County, MIUpdated

Raeden (with Cal Realty / Ferragon Corp.) has proposed a 100 MW data center in Wayne County, Michigan (proposed). 2 sources report this facility in the Kapwork Grow tracker.

Capacity
100 MW
Investment
$2

Who's on this build

Named in the cited sources. No source reports who builds it.

  • Operator

    Raeden (with Cal Realty / Ferragon Corp.)

Timeline

Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.

  1. Today

    Proposed

    Last material change Sep 24, 2026.

  2. 6 mo ago

    Announced

  3. 6 mo ago

    Reported as announced

    Event date: · First observed: Not reported

Reported updates without an event date

Record quality

Datasets
2, all agree
Location
Street address reported
Summary
From published records
Source as of
Last material change

Site and infrastructure

CA Compute AtlasSC Server CountryKW Kapwork Grow tracker record

Status

Operator
Raeden (with Cal Realty / Ferragon Corp.)Operator · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 9, 2026 · Record: raeden-gibraltar-mclouth-miOperator · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0944
Stage
ProposedStage · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 9, 2026 · Record: raeden-gibraltar-mclouth-miStage · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0944
Facility type
AI data centerFacility type · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 155593116935514

Scale

Reported capacity
100 MWReported capacity · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 9, 2026 · Record: raeden-gibraltar-mclouth-miReported capacity · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0944
Reported investment
$2Reported investment · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 155593116935514

Reported dates

Announced
2026-03-11Announced · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0944Reported date — see the source for the event evidenced.

Site

City
GibraltarCity · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 9, 2026 · Record: raeden-gibraltar-mclouth-miCity · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0944
County
WayneCounty · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 9, 2026 · Record: raeden-gibraltar-mclouth-miCounty · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0944
State
MichiganState · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 9, 2026 · Record: raeden-gibraltar-mclouth-miState · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0944
Location precision
Street address reportedLocation precision · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 155593116935514
Community response
Local opposition reportedCommunity response · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 155593116935514

Power and cooling

AI workload
AI or machine-learning workload reportedAI workload · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 155593116935514

Sources, method and limits

Show 4 sourcesHide

What each source reports

What each source reports
DatasetReported nameReported statusReported MW
Compute AtlasGibraltar Data Center (former McLouth Steel site)Proposed100 MW
Server CountryRaeden Gibraltar McLouth Steel Data CenterProposed100 MW

Sources and evidence

  1. CA
    Compute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Sep 9, 2026 · Record: raeden-gibraltar-mclouth-mi
  2. CA
  3. CA
  4. SC
    Server Country project record (CC BY 4.0)As of: Sep 24, 2026 · Record: 0944
  5. KW

Limitations and interpretation

  • This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
  • Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0) · Server Country, https://servercountry.org/data/ (CC BY 4.0). Every source is licensed for commercial use with attribution.
  • An announced or permitted build is not a contract, an open bid or a purchase order.
  • Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.

Cite or correct this record

Kapwork Grow, “Gibraltar Data Center (former McLouth Steel site)”, https://kapwork.com/grow/directory/datacenters/gibraltar-data-center-former-mclouth-steel-site-mi-dc_8d82d876e55a, materially updated Sep 24, 2026.

Report an error in this record and we will check it against the cited sources.

An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.

More builds

Kapwork Grow

Every data center build in the directory, in one place.

Search by company, place or trade.

Browse all builds