Skip to content
Data center buildProposed

Hilcorp Endicott Bitcoin Mining Pilot

TA InfrastructurePrudhoe Bay, North Slope Borough County, AKUpdated

TA Infrastructure has proposed a 1.4 MW data center in North Slope Borough, Alaska (proposed). One source reports this facility in the Kapwork Grow tracker.

Capacity
1.4 MW
Building area
400 sq ft
Expected completion
Nov 2028 (2028-11)
IT load
1.4 MW

Who's on this build

Named in the cited sources. No source reports who builds it.

  • Operator

    TA Infrastructure

Schedule

Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.

  1. in ~2 yr

    Expected completionPlanned

  2. Today

    Proposed

    Last material change Sep 24, 2026.

  3. ~2 yr ago

    Announced

  4. ~2 yr ago

    Construction start

Reported updates without an event date

Record quality

Datasets
1
Location
Approximate: city centroid
Summary
From published records
Source as of
Last material change

Site and infrastructure

SC Server CountryKW Kapwork Grow tracker record

Status

Operator
TA InfrastructureOperator · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0014
Stage
ProposedStage · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0014
Facility type
EnterpriseFacility type · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 29249789746513

Scale

Reported capacity
1.4 MWReported capacity · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0014
Reported IT load
1.4 MWReported IT load · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 29249789746513
Reported building area
400 sq ftReported building area · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 29249789746513

Reported dates

Announced
2024-11Announced · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0014
Construction start reported
2024-11Construction start reported · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0014
Expected completion
2028-11Expected completion · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0014

Site

City
Prudhoe BayCity · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0014
County
North Slope BoroughCounty · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0014
State
AlaskaState · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0014
Location precision
Approximate: city centroidLocation precision · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 29249789746513

Sources, method and limits

Show 1 sourceHide

What each source reports

What each source reports
DatasetReported nameReported statusReported MW
Server CountryHilcorp Endicott Bitcoin Mining PilotProposed1.4 MW

Sources and evidence

  1. SC
    Server Country project record (CC BY 4.0)As of: Sep 24, 2026 · Record: 0014
  2. KW

Limitations and interpretation

  • This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
  • Sources on this record: Server Country, https://servercountry.org/data/ (CC BY 4.0). Every source is licensed for commercial use with attribution.
  • An announced or permitted build is not a contract, an open bid or a purchase order.
  • Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.

Cite or correct this record

Kapwork Grow, “Hilcorp Endicott Bitcoin Mining Pilot”, https://kapwork.com/grow/directory/datacenters/hilcorp-endicott-bitcoin-mining-pilot-ak-dc_1a9a3f53dd51, materially updated Sep 24, 2026.

Report an error in this record and we will check it against the cited sources.

An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.

More builds

Kapwork Grow

Every data center build in the directory, in one place.

Search by company, place or trade.

Browse all builds