ImpactData Greensboro
ImpactData is building a 20 MW data center in Guilford County, North Carolina (under construction). One source reports this facility in the Kapwork Grow tracker.
- Capacity
- 20 MW
Who's on this build
Named in the cited sources. No source reports who builds it.
Operator
ImpactData
Timeline
Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.
- this year
Construction start
- Today
Under construction
Last material change Sep 24, 2026.
Reported updates without an event date
Reported for 2026.
Event date: Not reported · First observed: Not reported
Record quality
- Datasets
- 1
- Location
- Site footprint confirmed
- Summary
- From published records
- Source as of
- Last material change
Site and infrastructure
CA Compute AtlasKW Kapwork Grow tracker record
Status
- Operator
- ImpactData
- Stage
- Under construction
- Facility type
- AI data center
Scale
- Reported capacity
- 20 MW
Reported dates
- Construction start reported
- 2026
Site
- City
- Greensboro
- County
- Guilford
- State
- North Carolina
- Location precision
- Site footprint confirmed
Power and cooling
- Power source
- Grid power
- AI workload
- Likely AI or machine-learning workload
Sources, method and limits
Show 2 sourcesHide
What each source reports
| Dataset | Reported name | Reported status | Reported MW |
|---|---|---|---|
| Compute Atlas | ImpactData Greensboro | Under construction | 20 MW |
Sources and evidence
- CACompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Jul 7, 2026 · Record: impactdata-greensboro-nc
- CABlackridge Research (cited by Compute Atlas)As of: Jul 7, 2026
- KWKapwork Grow tracker record, merged from the sources listed here (free account)As of: Sep 23, 2026 · Record: 40115525533240
Limitations and interpretation
- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.
Cite or correct this record
Kapwork Grow, “ImpactData Greensboro”, https://kapwork.com/grow/directory/datacenters/impactdata-greensboro-nc-dc_247c1fa63e38, materially updated Sep 24, 2026.
Report an error in this record and we will check it against the cited sources.
An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.
More builds
In North Carolina
- Amazon Web Services (AWS) Richmond County CampusNorth Carolina
- Amazon Web Services Richmond County Data Center CampusNorth Carolina
- American Tower Reedy Creek Data Center (East Charlotte)North Carolina
- Compass Statesville CampusNorth Carolina
- Deep River Data AI Data Center (Cumnock, Lee County)North Carolina
Kapwork Grow
Every data center build in the directory, in one place.
Search by company, place or trade.