Skip to content
Data center buildProposed

IREN Oklahoma Data Center Campus

IRENOKUpdated

IREN has proposed a 1600 MW data center in Unknown County, Oklahoma (proposed). One source reports this facility in the Kapwork Grow tracker.

Capacity
1600 MW
Expected completion
2028

Who's on this build

Named in the cited sources. No source reports who builds it.

Schedule

Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.

  1. in 2 yr

    Expected completionPlanned

  2. Today

    Proposed

    Last material change Sep 24, 2026.

  3. 7 mo ago

    Announced

  4. 7 mo ago

    Reported as announced

    Event date: · First observed: Not reported

Reported updates without an event date

Record quality

Datasets
1
Summary
From published records
Source as of
Last material change

Site and infrastructure

SC Server CountryKW Kapwork Grow tracker record

Status

Operator
IRENOperator · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0997
Stage
ProposedStage · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0997
Facility type
AI data centerFacility type · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 201327812351687

Scale

Reported capacity
1600 MWReported capacity · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0997

Reported dates

Announced
2026-02-05Announced · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0997Reported date — see the source for the event evidenced.
Expected completion
2028Expected completion · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0997

Site

County
UnknownCounty · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0997
State
OklahomaState · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0997

Power and cooling

AI workload
AI or machine-learning workload reportedAI workload · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 201327812351687

Sources, method and limits

Show 1 sourceHide

What each source reports

What each source reports
DatasetReported nameReported statusReported MW
Server CountryIREN Oklahoma Data Center CampusProposed1600 MW

Sources and evidence

  1. SC
    Server Country project record (CC BY 4.0)As of: Sep 24, 2026 · Record: 0997
  2. KW

Limitations and interpretation

  • This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
  • Sources on this record: Server Country, https://servercountry.org/data/ (CC BY 4.0). Every source is licensed for commercial use with attribution.
  • An announced or permitted build is not a contract, an open bid or a purchase order.
  • Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.

Cite or correct this record

Kapwork Grow, “IREN Oklahoma Data Center Campus”, https://kapwork.com/grow/directory/datacenters/iren-oklahoma-data-center-campus-ok-dc_b71b48bd16c7, materially updated Sep 24, 2026.

Report an error in this record and we will check it against the cited sources.

An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.

More builds

Kapwork Grow

Every data center build in the directory, in one place.

Search by company, place or trade.

Browse all builds