Keel Scrubgrass AI/HPC Data Center Campus
Keel Infrastructure (formerly Bitfarms) is expanding a 1300 MW data center in Venango County, Pennsylvania (expanding). One source reports this facility in the Kapwork Grow tracker.
- Capacity
- 1300 MW
- Expected completion
- 2028
Who's on this build
Named in the cited sources. No source reports who builds it.
- Other Keel Infrastructure (formerly Bitfarms) builds
Operator
Keel Infrastructure (formerly Bitfarms)
Schedule
Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.
- in 2 yr
Expected completionPlanned
- Today
Expanding
Last material change Sep 24, 2026.
- 2 mo ago
Announced
- 2 mo ago
Event date: · First observed: Not reported
Reported updates without an event date
Reported for 2028.
Event date: Not reported · First observed: Not reported
Record quality
- Datasets
- 1
- Summary
- From published records
- Source as of
- Last material change
Site and infrastructure
SC Server CountryKW Kapwork Grow tracker record
Status
- Operator
- Keel Infrastructure (formerly Bitfarms)
- Stage
- Expanding
- Facility type
- AI data center
Scale
- Reported capacity
- 1300 MW
Reported dates
- Announced
- 2026-07-02Reported date — see the source for the event evidenced.
- Expected completion
- 2028
Site
- City
- Kennerdell / Scrubgrass Township
- County
- Venango County
- State
- Pennsylvania
Power and cooling
- AI workload
- AI or machine-learning workload reported
Sources, method and limits
Show 1 sourceHide
What each source reports
| Dataset | Reported name | Reported status | Reported MW |
|---|---|---|---|
| Server Country | Keel Scrubgrass AI/HPC Data Center Campus | Expanding | 1300 MW |
Sources and evidence
- SCServer Country project record (CC BY 4.0)As of: Sep 24, 2026 · Record: 1009
- KWKapwork Grow tracker record, merged from the sources listed here (free account)As of: Sep 23, 2026 · Record: 265948298530046
Limitations and interpretation
- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Server Country, https://servercountry.org/data/ (CC BY 4.0). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.
Cite or correct this record
Kapwork Grow, “Keel Scrubgrass AI/HPC Data Center Campus”, https://kapwork.com/grow/directory/datacenters/keel-scrubgrass-ai-hpc-data-center-campus-pa-dc_f1e0e9dcccfe, materially updated Sep 24, 2026.
Report an error in this record and we will check it against the cited sources.
An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.
More builds
- 1205 Commonwealth Dr. Data Center (former Pennhurst Asylum)Pennsylvania
- 2100 Renaissance Blvd. Data Center (MLP Ventures)Pennsylvania
- 216 Greenfield Road (Chirisa Technology Parks)Pennsylvania
- 2201, 2301, 2501, 2701, & 2901 Renaissance Blvd. Data Center (MLP Ventures)Pennsylvania
- 3200 Horizon Dr. Data Center (MLP Ventures)Pennsylvania
Kapwork Grow
Every data center build in the directory, in one place.
Search by company, place or trade.