Monarch Data Center
Copia Power has approval for a 1000 MW data center in Lyon County, Nevada (approved). 2 sources report this facility in the Kapwork Grow tracker.
- Capacity
- 1000 MW
- Investment
- $1 ($1.2)
- Building area
- 5 sq ft
- Site
- 505 acres
Who's on this build
Named in the cited sources. No source reports who builds it.
Operator
Copia Power
Utility
NV Energy
Timeline
Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.
- Today
Approved
Last material change Sep 24, 2026.
- 14 mo ago
Announced
- 14 mo ago
Event date: · First observed: Not reported
Reported updates without an event date
Reported for 2025-07.
Event date: Not reported · First observed: Not reported
Record quality
- Datasets
- 2, figures differ
- Location
- Street address reported
- Summary
- From published records
- Source as of
- Last material change
Site and infrastructure
CA Compute AtlasSC Server CountryKW Kapwork Grow tracker record
Status
- Operator
- Copia Power
- Stage
- Approved
- Facility type
- AI data center
Scale
- Reported capacity
- 1000 MW
- Reported investment
- $1.2
- Reported building area
- 5 sq ft
- Site area
- 505 acres
Reported dates
- Announced
- 2025-07-08Reported date — see the source for the event evidenced.
Site
- City
- Yerington
- County
- Lyon
- State
- Nevada
- Location precision
- Street address reported
- Community response
- Local opposition reported
Power and cooling
- Utility
- NV Energy
- Power source
- On-site natural gas generation
- Cooling
- Air cooled
- AI workload
- Likely AI or machine-learning workload
Sources, method and limits
Show 6 sourcesHide
What each source reports
| Dataset | Reported name | Reported status | Reported MW |
|---|---|---|---|
| Compute Atlas | Monarch Data Center | Approved | 1000 MW |
| Server Country | Monarch Data Center | Proposed | 1000 MW |
Sources and evidence
- CACompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Sep 11, 2026 · Record: monarch-data-center-yerington-nv
- CAKOLO 8 News Now (cited by Compute Atlas)As of: Aug 29, 2026
- CACarson Now / The Nevada Independent (cited by Compute Atlas)As of: Sep 11, 2026
- CANVBEX (cited by Compute Atlas)As of: Aug 29, 2026
- CANVBEX (cited by Compute Atlas)As of: Sep 11, 2026
- SCServer Country project record (CC BY 4.0)As of: Sep 24, 2026 · Record: 0961
- KWKapwork Grow tracker record, merged from the sources listed here (free account)As of: Sep 23, 2026 · Record: 141753651743847
Limitations and interpretation
- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0) · Server Country, https://servercountry.org/data/ (CC BY 4.0). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.
Cite or correct this record
Kapwork Grow, “Monarch Data Center”, https://kapwork.com/grow/directory/datacenters/monarch-data-center-nv-dc_80ec980ecc67, materially updated Sep 24, 2026.
Report an error in this record and we will check it against the cited sources.
An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.