Skip to content
Data center buildProposed

Niagara Digital Campus

Urbacon Data Centre SolutionsNiagara Falls, Niagara County, NYUpdated

Urbacon Data Centre Solutions has proposed a 135 MW data center in Niagara County, New York (proposed). One source reports this facility in the Kapwork Grow tracker.

Capacity
135 MW
Investment
$1.5B
Site
142 acres
Reported jobs
550

Who's on this build

Named in the cited sources. No source reports who builds it.

  • Operator

    Urbacon Data Centre Solutions

  • Utility

    New York Power Authority (NYPA)

Timeline

Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.

Reported updates without an event date

Record quality

Datasets
1
Location
Site footprint confirmed
Summary
From published records
Source as of
Last material change

Site and infrastructure

CA Compute AtlasKW Kapwork Grow tracker record

Status

Operator
Urbacon Data Centre SolutionsOperator · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 9, 2026 · Record: niagara-digital-campus-niagara-falls-ny
Stage
ProposedStage · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 9, 2026 · Record: niagara-digital-campus-niagara-falls-ny
Facility type
AI data centerFacility type · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 54683961653272

Scale

Reported capacity
135 MWReported capacity · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 9, 2026 · Record: niagara-digital-campus-niagara-falls-ny
Reported investment
$1.5BReported investment · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 54683961653272
Site area
142 acresSite area · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 54683961653272
Reported jobs
550Reported jobs · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 54683961653272

Site

City
Niagara FallsCity · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 9, 2026 · Record: niagara-digital-campus-niagara-falls-ny
County
NiagaraCounty · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 9, 2026 · Record: niagara-digital-campus-niagara-falls-ny
State
New YorkState · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 9, 2026 · Record: niagara-digital-campus-niagara-falls-ny
Location precision
Site footprint confirmedLocation precision · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 54683961653272

Power and cooling

Utility
New York Power Authority (NYPA)Utility · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 54683961653272
Power source
HydroelectricPower source · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 54683961653272
AI workload
Likely AI or machine-learning workloadAI workload · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 9, 2026 · Record: niagara-digital-campus-niagara-falls-ny

Sources, method and limits

Show 5 sourcesHide

What each source reports

What each source reports
DatasetReported nameReported statusReported MW
Compute AtlasNiagara Digital CampusProposed135 MW

Sources and evidence

  1. CA
    Compute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Sep 9, 2026 · Record: niagara-digital-campus-niagara-falls-ny
  2. CA
  3. CA
  4. CA
  5. CA
  6. KW

Limitations and interpretation

  • This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
  • Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0). Every source is licensed for commercial use with attribution.
  • An announced or permitted build is not a contract, an open bid or a purchase order.
  • Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.

Cite or correct this record

Kapwork Grow, “Niagara Digital Campus”, https://kapwork.com/grow/directory/datacenters/niagara-digital-campus-ny-dc_31bc1a1bf818, materially updated Sep 24, 2026.

Report an error in this record and we will check it against the cited sources.

An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.

More builds

Kapwork Grow

Every data center build in the directory, in one place.

Search by company, place or trade.

Browse all builds