Nobles County Powered Data Park
Geronimo Power (Brookfield Asset Management subsidiary) has proposed a 400 MW data center in Nobles County, Minnesota (proposed). One source reports this facility in the Kapwork Grow tracker.
- Capacity
- 400 MW
Who's on this build
Named in the cited sources. No source reports who builds it.
Operator
Geronimo Power (Brookfield Asset Management subsidiary)
Utility
City of Worthington
Record quality
- Datasets
- 1
- Location
- Site footprint confirmed
- Summary
- From published records
- Source as of
- Last material change
Site and infrastructure
CA Compute AtlasKW Kapwork Grow tracker record
Status
- Operator
- Geronimo Power (Brookfield Asset Management subsidiary)
- Stage
- Proposed
- Facility type
- AI data center
Scale
- Reported capacity
- 400 MW
Site
- City
- Worthington
- County
- Nobles
- State
- Minnesota
- Location precision
- Site footprint confirmed
- Community response
- Local opposition reported
Power and cooling
- Utility
- City of Worthington
- Power source
- Wind
- AI workload
- Likely AI or machine-learning workload
Sources, method and limits
Show 6 sourcesHide
What each source reports
| Dataset | Reported name | Reported status | Reported MW |
|---|---|---|---|
| Compute Atlas | Nobles County Powered Data Park | Proposed | 400 MW |
Sources and evidence
- CACompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Aug 24, 2026 · Record: geronimo-nobles-county-powered-data-park-mn
- CAMinnesota Reformer (cited by Compute Atlas)As of: Jul 9, 2026
- CAGeronimo Power (cited by Compute Atlas)As of: Jul 9, 2026
- CAOak Ridge National Laboratory (ORNL) / HIFLD (cited by Compute Atlas)As of: Jul 23, 2026
- CAReport cited by Compute AtlasAs of: Jul 24, 2026
- CADakota News Now (cited by Compute Atlas)As of: Aug 24, 2026
- KWKapwork Grow tracker record, merged from the sources listed here (free account)As of: Sep 23, 2026 · Record: 204210003061298
Limitations and interpretation
- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.
Cite or correct this record
Kapwork Grow, “Nobles County Powered Data Park”, https://kapwork.com/grow/directory/datacenters/nobles-county-powered-data-park-mn-dc_b9ba58b12a32, materially updated Sep 24, 2026.
Report an error in this record and we will check it against the cited sources.
An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.
More builds
Kapwork Grow
Every data center build in the directory, in one place.
Search by company, place or trade.