Skip to content
Data center buildProposed2 datasets report

Project Alpaca (Midway Green Industrial Park)

Volt Edge EnergyUnion, Union County, SCUpdated

Volt Edge Energy has proposed a 49 MW data center in Union County, South Carolina (proposed). 2 sources report this facility in the Kapwork Grow tracker.

Capacity
49 MW
Investment
$410M
Reported jobs
50

Who's on this build

Named in the cited sources. No source reports who builds it.

  • Operator

    Volt Edge Energy

Timeline

Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.

  1. Today

    Proposed

    Last material change Sep 24, 2026.

  2. 5 mo ago

    Announced

  3. 5 mo ago

    Reported as announced

    Event date: · First observed: Not reported

Record quality

Datasets
2, figures differ
Location
Street address reported
Summary
From published records
Source as of
Last material change

Site and infrastructure

CA Compute AtlasSC Server CountryKW Kapwork Grow tracker record

Status

Operator
Volt Edge EnergyOperator · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 13, 2026 · Record: volt-edge-project-alpaca-union-county-scOperator · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0819
Stage
ProposedStage · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 13, 2026 · Record: volt-edge-project-alpaca-union-county-sc
Facility type
AI data centerFacility type · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 279218645225056

Scale

Reported capacity
49 MWReported capacity · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 13, 2026 · Record: volt-edge-project-alpaca-union-county-scReported capacity · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0819
Reported investment
$410MReported investment · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 279218645225056
Reported jobs
50Reported jobs · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 279218645225056

Reported dates

Announced
2026-04-28Announced · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0819Reported date — see the source for the event evidenced.

Site

City
UnionCity · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 13, 2026 · Record: volt-edge-project-alpaca-union-county-scCity · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0819
County
UnionCounty · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 13, 2026 · Record: volt-edge-project-alpaca-union-county-scCounty · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0819
State
South CarolinaState · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 13, 2026 · Record: volt-edge-project-alpaca-union-county-scState · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0819
Location precision
Street address reportedLocation precision · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 279218645225056
Community response
Local opposition reportedCommunity response · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 279218645225056

Power and cooling

AI workload
AI or machine-learning workload reportedAI workload · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 279218645225056

Sources, method and limits

Show 4 sourcesHide

What each source reports

What each source reports
DatasetReported nameReported statusReported MW
Compute AtlasProject Alpaca (Midway Green Industrial Park)Proposed49 MW
Server CountryProject Alpaca Union County Data CenterCancelled49 MW

Sources and evidence

  1. CA
    Compute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Sep 13, 2026 · Record: volt-edge-project-alpaca-union-county-sc
  2. CA
  3. CA
  4. SC
    Server Country project record (CC BY 4.0)As of: Sep 24, 2026 · Record: 0819
  5. KW

Limitations and interpretation

  • This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
  • Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0) · Server Country, https://servercountry.org/data/ (CC BY 4.0). Every source is licensed for commercial use with attribution.
  • An announced or permitted build is not a contract, an open bid or a purchase order.
  • Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.

Cite or correct this record

Kapwork Grow, “Project Alpaca (Midway Green Industrial Park)”, https://kapwork.com/grow/directory/datacenters/project-alpaca-midway-green-industrial-park-sc-dc_fdf2a829ce60, materially updated Sep 24, 2026.

Report an error in this record and we will check it against the cited sources.

An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.

More builds

Kapwork Grow

Every data center build in the directory, in one place.

Search by company, place or trade.

Browse all builds