Project Phoenix (Aligned Data Centers) - Phase 1
An unnamed operator has proposed a data center in Beaver County, Pennsylvania (proposed). One source reports this facility in the Kapwork Grow tracker.
- Pennsylvania DEP permits on file
- 5
Timeline
Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.
- Today
Proposed
Last material change Sep 24, 2026.
- 11 mo ago
Announced
- 11 mo ago
Event date: · First observed: Not reported
Record quality
- Datasets
- 1
- Location
- Street address reported
- Summary
- From published records
- Source as of
- Last material change
Site and infrastructure
PA DEP Pennsylvania DEP permit trackerKW Kapwork Grow tracker record
Status
- Stage
- Proposed
Reported dates
- Announced
- 2025-10-31Reported date — see the source for the event evidenced.
Site
- City
- Shippingport Borough
- County
- Beaver
- State
- Pennsylvania
- Location precision
- Street address reported
Permits and public records
- Pennsylvania DEP review
- Permit applications under DEP review
- Pennsylvania DEP permits on file
- 5
Sources, method and limits
Show 1 sourceHide
What each source reports
| Dataset | Reported name | Reported status | Reported MW |
|---|---|---|---|
| Pennsylvania DEP | Project Phoenix (Aligned Data Centers) - Phase 1 | Proposed | Not reported |
Sources and evidence
- PA DEPPennsylvania DEP Data Center Permit Tracker record (state government data)As of: Aug 19, 2026 · Record: 10000014
- KWKapwork Grow tracker record, merged from the sources listed here (free account)As of: Sep 23, 2026 · Record: 179391826478668
Limitations and interpretation
- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Pennsylvania Department of Environmental Protection, Data Center Permit Tracker (state government data). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.
Cite or correct this record
Kapwork Grow, “Project Phoenix (Aligned Data Centers) - Phase 1”, https://kapwork.com/grow/directory/datacenters/project-phoenix-aligned-data-centers-phase-1-pa-dc_a327ea17c64c, materially updated Sep 24, 2026.
Report an error in this record and we will check it against the cited sources.
An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.
More builds
In Pennsylvania
- 1205 Commonwealth Dr. Data Center (former Pennhurst Asylum)Pennsylvania
- 2100 Renaissance Blvd. Data Center (MLP Ventures)Pennsylvania
- 216 Greenfield Road (Chirisa Technology Parks)Pennsylvania
- 2201, 2301, 2501, 2701, & 2901 Renaissance Blvd. Data Center (MLP Ventures)Pennsylvania
- 3200 Horizon Dr. Data Center (MLP Ventures)Pennsylvania
Kapwork Grow
Every data center build in the directory, in one place.
Search by company, place or trade.