Data center buildProposed

Sagebrush Hallam Hyperscale Campus (proposed)

Sagebrush Infrastructure PartnersHallam, Lancaster County, NEUpdated

Sagebrush Infrastructure Partners has proposed a 1700 MW data center in Lancaster County, Nebraska (proposed). One source reports this facility in the Kapwork Grow tracker.

Capacity
1700 MW
Site
1,400 acres

Who's on this build

Named in the cited sources. No source reports who builds it.

  • Operator

    Sagebrush Infrastructure Partners

Timeline

Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.

  1. Today

    Proposed

    Last material change Sep 24, 2026.

  2. 32 days ago

    Reported as announced

    Event date: · First observed: Not reported

  3. 1 mo ago

    Announced

Reported updates without an event date

Record quality

Datasets
1
Location
Street address reported
Summary
From published records
Source as of
Last material change

Site and infrastructure

CA Compute AtlasKW Kapwork Grow tracker record

Status

Operator
Sagebrush Infrastructure PartnersOperator · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 16, 2026 · Record: sagebrush-hallam-hyperscale-campus-lancaster-ne
Stage
ProposedStage · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 16, 2026 · Record: sagebrush-hallam-hyperscale-campus-lancaster-ne
Facility type
AI data centerFacility type · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 62268829426459

Scale

Reported capacity
1700 MWReported capacity · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 16, 2026 · Record: sagebrush-hallam-hyperscale-campus-lancaster-ne
Site area
1,400 acresSite area · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 62268829426459

Reported dates

Announced
2026-08Announced · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 16, 2026 · Record: sagebrush-hallam-hyperscale-campus-lancaster-ne

Site

City
HallamCity · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 16, 2026 · Record: sagebrush-hallam-hyperscale-campus-lancaster-ne
County
LancasterCounty · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 16, 2026 · Record: sagebrush-hallam-hyperscale-campus-lancaster-ne
State
NebraskaState · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 16, 2026 · Record: sagebrush-hallam-hyperscale-campus-lancaster-ne
Location precision
Street address reportedLocation precision · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 62268829426459
Community response
Local opposition reportedCommunity response · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 62268829426459

Power and cooling

Power source
On-site natural gas generationPower source · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 62268829426459
AI workload
Likely AI or machine-learning workloadAI workload · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 16, 2026 · Record: sagebrush-hallam-hyperscale-campus-lancaster-ne

Sources, method and limits

Show 3 sourcesHide

What each source reports

What each source reports
DatasetReported nameReported statusReported MW
Compute AtlasSagebrush Hallam Hyperscale Campus (proposed)Proposed1700 MW

Sources and evidence

  1. CA
    Compute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Sep 16, 2026 · Record: sagebrush-hallam-hyperscale-campus-lancaster-ne
  2. CA
  3. CA
  4. KW

Limitations and interpretation

  • This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
  • Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0). Every source is licensed for commercial use with attribution.
  • An announced or permitted build is not a contract, an open bid or a purchase order.
  • Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.

Cite or correct this record

Kapwork Grow, “Sagebrush Hallam Hyperscale Campus (proposed)”, https://kapwork.com/grow/directory/datacenters/sagebrush-hallam-hyperscale-campus-proposed-ne-dc_38a21775631b, materially updated Sep 24, 2026.

Report an error in this record and we will check it against the cited sources.

An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.