Sentinel East Whiteland Data Center
Sentinel Data Centers is building a 300 MW data center in Chester County, Pennsylvania (under construction). 2 sources report this facility in the Kapwork Grow tracker.
- Capacity
- 300 MW
- Site
- 100 acres
Who's on this build
Named in the cited sources. No source reports who builds it.
- Other Sentinel Data Centers builds
Operator
Sentinel Data Centers
Utility
PECO
Timeline
Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.
- Today
Under construction
Last material change Sep 24, 2026.
- 42 days ago
Construction start
- 42 days ago
Event date: · First observed: Not reported
- ~2 yr ago
Announced
- ~2 yr ago
Event date: · First observed: Not reported
Record quality
- Datasets
- 2, figures differ
- Location
- Site footprint confirmed
- Summary
- From published records
- Source as of
- Last material change
Site and infrastructure
CA Compute AtlasPA DEP Pennsylvania DEP permit trackerKW Kapwork Grow tracker record
Status
- Operator
- Sentinel Data Centers
- Stage
- Under construction
- Facility type
- AI data center
Scale
- Reported capacity
- 300 MW
- Site area
- 100 acres
Reported dates
- Announced
- 2024-11-01Reported date — see the source for the event evidenced.
- Construction start reported
- 2026-08-17Reported date — see the source for the event evidenced.
Site
- City
- East Whiteland Township
- County
- Chester
- State
- Pennsylvania
- Location precision
- Site footprint confirmed
- Community response
- Local opposition reported
Power and cooling
- Utility
- PECO
- Power source
- Grid power
- AI workload
- Likely AI or machine-learning workload
Permits and public records
- Pennsylvania DEP review
- Permit applications under DEP review
- Pennsylvania DEP permits on file
- 3
Sources, method and limits
Show 7 sourcesHide
What each source reports
| Dataset | Reported name | Reported status | Reported MW |
|---|---|---|---|
| Compute Atlas | Sentinel East Whiteland Data Center | Under construction | 300 MW |
| Pennsylvania DEP | Project Forge Data Center (Sentinel Green Fig LLC) | Proposed | Not reported |
Sources and evidence
- CACompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Aug 17, 2026 · Record: sentinel-east-whiteland-chester-county-pa
- CACleanView (cited by Compute Atlas)As of: Jul 9, 2026
- CAPhiladelphia Inquirer (cited by Compute Atlas)As of: Jul 9, 2026
- CAOak Ridge National Laboratory (ORNL) / HIFLD (cited by Compute Atlas)As of: Jul 23, 2026
- CAThe Philadelphia Inquirer (cited by Compute Atlas)As of: Aug 17, 2026
- CASuburban Realtors Alliance (cited by Compute Atlas)As of: Aug 17, 2026
- PA DEPPennsylvania DEP Data Center Permit Tracker record (state government data)As of: Mar 25, 2025 · Record: 10000010
- KWKapwork Grow tracker record, merged from the sources listed here (free account)As of: Sep 23, 2026 · Record: 185228584581979
Limitations and interpretation
- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0) · Pennsylvania Department of Environmental Protection, Data Center Permit Tracker (state government data). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.
Cite or correct this record
Kapwork Grow, “Sentinel East Whiteland Data Center”, https://kapwork.com/grow/directory/datacenters/sentinel-east-whiteland-data-center-pa-dc_a876e3fc7b5b, materially updated Sep 24, 2026.
Report an error in this record and we will check it against the cited sources.
An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.
More builds
- 1205 Commonwealth Dr. Data Center (former Pennhurst Asylum)Pennsylvania
- 2100 Renaissance Blvd. Data Center (MLP Ventures)Pennsylvania
- 216 Greenfield Road (Chirisa Technology Parks)Pennsylvania
- 2201, 2301, 2501, 2701, & 2901 Renaissance Blvd. Data Center (MLP Ventures)Pennsylvania
- 3200 Horizon Dr. Data Center (MLP Ventures)Pennsylvania
Kapwork Grow
Every data center build in the directory, in one place.
Search by company, place or trade.