Social Circle Technology Park
TPA Group (developer; end tenant undisclosed) has proposed a data center in Walton County, Georgia (proposed). 2 sources report this facility in the Kapwork Grow tracker.
- Investment
- $5B
- Building area
- 2.56M sq ft (2,560,000 sq ft)
- Site
- 317 acres
- Expected completion
- 2031
- Reported jobs
- 200
Who's on this build
Named in the cited sources. No source reports who builds it.
Operator
TPA Group (developer; end tenant undisclosed)
Utility
Georgia Power
Schedule
Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.
- in 5 yr
Expected completionPlanned
- in 2 yr
Construction start
- Today
Proposed
Last material change Sep 24, 2026.
- ~2 yr ago
Announced
Reported updates without an event date
Reported for 2031.
Event date: Not reported · First observed: Not reported
Reported for 2028.
Event date: Not reported · First observed: Not reported
Reported for 2025-04.
Event date: Not reported · First observed: Not reported
Record quality
- Datasets
- 2, figures differ
- Location
- Site footprint confirmed
- Summary
- From published records
- Source as of
- Last material change
Site and infrastructure
CA Compute AtlasSC Server CountryKW Kapwork Grow tracker record
Status
- Operator
- TPA Group (developer; end tenant undisclosed)
- Stage
- Proposed
- Facility type
- AI data center
Scale
- Reported investment
- $5B
- Reported building area
- 2,560,000 sq ft
- Site area
- 317 acres
- Reported jobs
- 200
Reported dates
- Announced
- 2025-01
- Construction start reported
- 2028
- Expected completion
- 2031
Site
- City
- Social Circle
- County
- Walton
- State
- Georgia
- Location precision
- Site footprint confirmed
- Community response
- Local opposition reported
Power and cooling
- Utility
- Georgia Power
- Power source
- Grid power
- AI workload
- Likely AI or machine-learning workload
Sources, method and limits
Show 6 sourcesHide
What each source reports
| Dataset | Reported name | Reported status | Reported MW |
|---|---|---|---|
| Compute Atlas | Social Circle Technology Park | Proposed | Not reported |
| Server Country | Newton County Technology Park (Social Circle Technology Park) | Proposed | Not reported |
Sources and evidence
- CACompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Jul 6, 2026 · Record: tpa-social-circle-technology-park-ga
- CABisnow (cited by Compute Atlas)As of: Jul 6, 2026
- CAData Center Dynamics (cited by Compute Atlas)As of: Jul 6, 2026
- CAMonroe Local News (cited by Compute Atlas)As of: Jul 6, 2026
- CAThe Covington News (cited by Compute Atlas)As of: Jul 6, 2026
- SCServer Country project record (CC BY 4.0)As of: Sep 24, 2026 · Record: 0118
- KWKapwork Grow tracker record, merged from the sources listed here (free account)As of: Sep 23, 2026 · Record: 265719762716283
Limitations and interpretation
- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0) · Server Country, https://servercountry.org/data/ (CC BY 4.0). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.
Cite or correct this record
Kapwork Grow, “Social Circle Technology Park”, https://kapwork.com/grow/directory/datacenters/social-circle-technology-park-ga-dc_f1abb411067b, materially updated Sep 24, 2026.
Report an error in this record and we will check it against the cited sources.
An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.