Townsite Solar 2 Boulder City Data Center
Townsite Solar 2 LLC has proposed a 167 MW data center in Clark County, Nevada (proposed). 2 sources report this facility in the Kapwork Grow tracker.
- Capacity
- 167 MW
- Investment
- $2B
- Building area
- 300,000 sq ft
- Site
- 89 acres
- Expected completion
- 2028
Who's on this build
Named in the cited sources. No source reports who builds it.
Operator
Townsite Solar 2 LLC
Schedule
Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.
- in 2 yr
Expected completionPlanned
- Today
Proposed
Last material change Sep 24, 2026.
- 2 mo ago
Event date: · First observed: Not reported
- 5 mo ago
Announced
Reported updates without an event date
Reported for 2028.
Event date: Not reported · First observed: Not reported
Reported for 2026-04.
Event date: Not reported · First observed: Not reported
Record quality
- Datasets
- 2, figures differ
- Location
- Street address reported
- Summary
- From published records
- Source as of
- Last material change
Site and infrastructure
CA Compute AtlasSC Server CountryKW Kapwork Grow tracker record
Status
- Operator
- Townsite Solar 2 LLC
- Stage
- Proposed
- Facility type
- AI data center
Scale
- Reported capacity
- 167 MW
- Capacity as the sources range
- 167 to 170 MW
- Reported investment
- $2B
- Reported building area
- 300,000 sq ft
- Site area
- 89 acres
Reported dates
- Announced
- 2026-04
- Expected completion
- 2028
Site
- City
- Boulder City
- County
- Clark
- State
- Nevada
- Location precision
- Street address reported
- Community response
- Local opposition reported
Power and cooling
- Power source
- Grid power
- Cooling
- Closed loop
- AI workload
- Likely AI or machine-learning workload
Sources, method and limits
Show 6 sourcesHide
What each source reports
| Dataset | Reported name | Reported status | Reported MW |
|---|---|---|---|
| Compute Atlas | Townsite Solar 2 Boulder City Data Center | Proposed | 167 MW |
| Server Country | Townsite Solar 2 Boulder City Data Center | Proposed | 170 MW |
Sources and evidence
- CACompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Sep 11, 2026 · Record: townsite-solar-2-boulder-city-nv
- CACity of Boulder City, Nevada (cited by Compute Atlas)As of: Aug 29, 2026
- CACleanview (cited by Compute Atlas)As of: Aug 29, 2026
- CA
- CAKJZZ (cited by Compute Atlas)As of: Sep 11, 2026
- SCServer Country project record (CC BY 4.0)As of: Sep 24, 2026 · Record: 0756
- KWKapwork Grow tracker record, merged from the sources listed here (free account)As of: Sep 23, 2026 · Record: 254045767322703
Limitations and interpretation
- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0) · Server Country, https://servercountry.org/data/ (CC BY 4.0). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.
Cite or correct this record
Kapwork Grow, “Townsite Solar 2 Boulder City Data Center”, https://kapwork.com/grow/directory/datacenters/townsite-solar-2-boulder-city-data-center-nv-dc_e70da3b7cc4f, materially updated Sep 24, 2026.
Report an error in this record and we will check it against the cited sources.
An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.