Vaultas St. Cloud
Vaultas has proposed a 0.6 MW data center in Stearns County, Minnesota (proposed). One source reports this facility in the Kapwork Grow tracker.
- Capacity
- 0.6 MW
Who's on this build
Named in the cited sources. No source reports who builds it.
Operator
Vaultas
Record quality
- Datasets
- 1
- Location
- Site footprint confirmed
- Summary
- From published records
- Source as of
- Last material change
Site and infrastructure
CA Compute AtlasKW Kapwork Grow tracker record
Status
- Operator
- Vaultas
- Stage
- Proposed
- Facility type
- Enterprise
Scale
- Reported capacity
- 0.6 MW
Site
- City
- St. Cloud
- County
- Stearns
- State
- Minnesota
- Location precision
- Site footprint confirmed
Sources, method and limits
Show 2 sourcesHide
What each source reports
| Dataset | Reported name | Reported status | Reported MW |
|---|---|---|---|
| Compute Atlas | Vaultas St. Cloud | Proposed | 0.6 MW |
Sources and evidence
- CACompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Aug 24, 2026 · Record: vaultas-st-cloud-mn
- CASt. Cloud Live (cited by Compute Atlas)As of: Aug 24, 2026
- KWKapwork Grow tracker record, merged from the sources listed here (free account)As of: Sep 23, 2026 · Record: 115866874270305
Limitations and interpretation
- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.
Cite or correct this record
Kapwork Grow, “Vaultas St. Cloud”, https://kapwork.com/grow/directory/datacenters/vaultas-st-cloud-mn-dc_69615be1d261, materially updated Sep 24, 2026.
Report an error in this record and we will check it against the cited sources.
An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.
More builds
Kapwork Grow
Every data center build in the directory, in one place.
Search by company, place or trade.