Skip to content
BEAD projectProvisional

Wabash Telephone · Fiber · Illinois

Official project code: CM61-BEAD-IL-BOTB-0007

Wabash TelephoneIllinoisUpdated

BOTB-0007 (CM61-BEAD-IL-BOTB-0007) is a broadband project record in Illinois. Recorded technology: Fiber. Reported award: not reported. Linked award holder: Wabash Telephone.

Technology
Fiber
Planned completion
Apr 30, 2028 (2028-04-30)

Who's on this project

The award holder decides its own bids and subcontracts.

Schedule

Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.

  1. in ~2 yr

    Planned completionPlanned

  2. Today

    Provisional

    Last material change Sep 14, 2026.

  3. 3 mo ago

    Planned startPlanned

Record quality

Sources cited
1
Summary
From published records
Source as of
Last material change

Record details

NTIA NTIA federal reporting

Official project code
CM61-BEAD-IL-BOTB-0007Official project code · NTIA federal reportingNTIA dashboard extractAs of Apr 13, 2026 · Record: ntia_powerbi:IL:CM61-BEAD-IL-BOTB-0007
Project state or territory
IllinoisProject state or territory · NTIA federal reportingNTIA dashboard extractAs of Apr 13, 2026 · Record: ntia_powerbi:IL:CM61-BEAD-IL-BOTB-0007
Reported award
Not reportedReported award · NTIA federal reportingNTIA dashboard extractAs of Apr 13, 2026 · Record: ntia_powerbi:IL:CM61-BEAD-IL-BOTB-0007Reporting period: 2026-04-13
Planned service locations
Not reportedPlanned service locations · NTIA federal reportingNTIA dashboard extractAs of Apr 13, 2026 · Record: ntia_powerbi:IL:CM61-BEAD-IL-BOTB-0007Reporting period: 2026-04-13
Recorded deployment technologies
FiberRecorded deployment technologies · NTIA federal reportingNTIA dashboard extractAs of Apr 13, 2026 · Record: ntia_powerbi:IL:CM61-BEAD-IL-BOTB-0007
Project award status
ProvisionalProject award status · NTIA federal reportingNTIA dashboard extractAs of Apr 13, 2026 · Record: ntia_powerbi:IL:CM61-BEAD-IL-BOTB-0007
Planned start
2026-06-30Planned start · NTIA federal reportingNTIA dashboard extractAs of Apr 13, 2026 · Record: ntia_powerbi:IL:CM61-BEAD-IL-BOTB-0007Planned date — not evidence that work occurred.
Planned completion
2028-04-30Planned completion · NTIA federal reportingNTIA dashboard extractAs of Apr 13, 2026 · Record: ntia_powerbi:IL:CM61-BEAD-IL-BOTB-0007Planned date — not evidence that work occurred.

Description supplied by the source

Wabash Telephone Cooperative Inc Optical Carrier Fiber to the Premises project connecting 641 locations

Description supplied by the source · NTIA federal reportingNTIA dashboard extractAs of Apr 13, 2026 · Record: ntia_powerbi:IL:CM61-BEAD-IL-BOTB-0007

Sources, method and limits

Show 1 sourceHide

Sources and evidence

  1. NTIA
    NTIA dashboard extractAs of: Apr 13, 2026 · Record: ntia_powerbi:IL:CM61-BEAD-IL-BOTB-0007

Limitations and interpretation

  • An award is a research signal. The award holder decides its own bids and subcontracts. Confirm project status and vendor needs with them.

Cite or correct this record

Kapwork Grow, “Wabash Telephone · Fiber · Illinois”, https://kapwork.com/grow/directory/bead/projects/botb-0007-pr_5b4c83d81bc287d2f3eb, materially updated Sep 14, 2026.

Report an error in this record and we will check it against the cited sources.

An award is not an open solicitation, revenue, cash received, or guaranteed contractor demand. A planned date alone does not establish construction or completion. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.

Related records

Kapwork Grow

Every BEAD award in the directory, in one place.

Search by trade, company or place.

Browse the directory