Skip to content
BEAD projectProvisional

Comcast Corporation · Fiber · Mississippi

Official project code: CM61-BEAD-MS-COM Madison 2-53

Comcast CorporationMississippiUpdated

Madison 2 - SS 3 (CM61-BEAD-MS-COM Madison 2-53) is a broadband project record in Mississippi. Recorded technology: Fiber. Reported award: not reported. Linked award holder: Comcast Corporation.

Technology
Fiber
Planned completion
Jun 1, 2029 (2029-06-01)

Who's on this project

The award holder decides its own bids and subcontracts.

Schedule

Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.

  1. in ~3 yr

    Planned completionPlanned

  2. Today

    Provisional

    Last material change Sep 17, 2026.

  3. 8 mo ago

    Planned startPlanned

Record quality

Sources cited
1
Summary
From published records
Source as of
Last material change

Record details

NTIA NTIA federal reporting

Official project code
CM61-BEAD-MS-COM Madison 2-53Official project code · NTIA federal reportingNTIA dashboard extractAs of Apr 13, 2026 · Record: ntia_powerbi:MS:CM61-BEAD-MS-COM Madison 2-53
Project state or territory
MississippiProject state or territory · NTIA federal reportingNTIA dashboard extractAs of Apr 13, 2026 · Record: ntia_powerbi:MS:CM61-BEAD-MS-COM Madison 2-53
Reported award
Not reportedReported award · NTIA federal reportingNTIA dashboard extractAs of Apr 13, 2026 · Record: ntia_powerbi:MS:CM61-BEAD-MS-COM Madison 2-53Reporting period: 2026-04-13
Planned service locations
Not reportedPlanned service locations · NTIA federal reportingNTIA dashboard extractAs of Apr 13, 2026 · Record: ntia_powerbi:MS:CM61-BEAD-MS-COM Madison 2-53Reporting period: 2026-04-13
Recorded deployment technologies
FiberRecorded deployment technologies · NTIA federal reportingNTIA dashboard extractAs of Apr 13, 2026 · Record: ntia_powerbi:MS:CM61-BEAD-MS-COM Madison 2-53
Project award status
ProvisionalProject award status · NTIA federal reportingNTIA dashboard extractAs of Apr 13, 2026 · Record: ntia_powerbi:MS:CM61-BEAD-MS-COM Madison 2-53
Planned start
2026-01-01Planned start · NTIA federal reportingNTIA dashboard extractAs of Apr 13, 2026 · Record: ntia_powerbi:MS:CM61-BEAD-MS-COM Madison 2-53Planned date — not evidence that work occurred.
Planned completion
2029-06-01Planned completion · NTIA federal reportingNTIA dashboard extractAs of Apr 13, 2026 · Record: ntia_powerbi:MS:CM61-BEAD-MS-COM Madison 2-53Planned date — not evidence that work occurred.

Description supplied by the source

Project to deploy broadband services to 53 locations

Description supplied by the source · NTIA federal reportingNTIA dashboard extractAs of Apr 13, 2026 · Record: ntia_powerbi:MS:CM61-BEAD-MS-COM Madison 2-53

Sources, method and limits

Show 1 sourceHide

Sources and evidence

  1. NTIA
    NTIA dashboard extractAs of: Apr 13, 2026 · Record: ntia_powerbi:MS:CM61-BEAD-MS-COM Madison 2-53

Limitations and interpretation

  • An award is a research signal. The award holder decides its own bids and subcontracts. Confirm project status and vendor needs with them.
  • Historical record: this entity is absent from the selected source snapshot. Check the dated source for current status.

Cite or correct this record

Kapwork Grow, “Comcast Corporation · Fiber · Mississippi”, https://kapwork.com/grow/directory/bead/projects/madison-2-ss-3-pr_b18eb65027da8effc262, materially updated Sep 17, 2026.

Report an error in this record and we will check it against the cited sources.

An award is not an open solicitation, revenue, cash received, or guaranteed contractor demand. A planned date alone does not establish construction or completion. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.

Related records

Kapwork Grow

Every BEAD award in the directory, in one place.

Search by trade, company or place.

Browse the directory