Data center buildProposed

APECS Data Center Campus (Former GM Assembly Plant)

Viridian Acquisitions LLCJanesville, Rock County, WIUpdated

Viridian Acquisitions LLC has proposed a 800 MW data center in Rock County, Wisconsin (proposed). One source reports this facility in the Kapwork Grow tracker.

Capacity
800 MW
Investment
$8B
Site
250 acres
Reported jobs
600

Who's on this build

Named in the cited sources. No source reports who builds it.

  • Operator

    Viridian Acquisitions LLC

Timeline

Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.

  1. Today

    Proposed

    Last material change Sep 24, 2026.

  2. 10 mo ago

    Reported as announced

    Event date: · First observed: Not reported

  3. 10 mo ago

    Announced

Reported updates without an event date

Record quality

Datasets
1
Location
Street address reported
Summary
From published records
Source as of
Last material change

Site and infrastructure

CA Compute AtlasKW Kapwork Grow tracker record

Status

Operator
Viridian Acquisitions LLCOperator · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Aug 18, 2026 · Record: viridian-apecs-janesville-wi
Stage
ProposedStage · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Aug 18, 2026 · Record: viridian-apecs-janesville-wi
Facility type
AI data centerFacility type · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 49849004946783

Scale

Reported capacity
800 MWReported capacity · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Aug 18, 2026 · Record: viridian-apecs-janesville-wi
Reported investment
$8BReported investment · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 49849004946783
Site area
250 acresSite area · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 49849004946783
Reported jobs
600Reported jobs · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 49849004946783

Reported dates

Announced
2025-11Announced · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Aug 18, 2026 · Record: viridian-apecs-janesville-wi

Site

City
JanesvilleCity · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Aug 18, 2026 · Record: viridian-apecs-janesville-wi
County
RockCounty · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Aug 18, 2026 · Record: viridian-apecs-janesville-wi
State
WisconsinState · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Aug 18, 2026 · Record: viridian-apecs-janesville-wi
Location precision
Street address reportedLocation precision · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 49849004946783
Community response
Local opposition reportedCommunity response · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 49849004946783

Power and cooling

AI workload
Likely AI or machine-learning workloadAI workload · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Aug 18, 2026 · Record: viridian-apecs-janesville-wi

Sources, method and limits

Show 4 sourcesHide

What each source reports

What each source reports
DatasetReported nameReported statusReported MW
Compute AtlasAPECS Data Center Campus (Former GM Assembly Plant)Proposed800 MW

Sources and evidence

  1. CA
    Compute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Aug 18, 2026 · Record: viridian-apecs-janesville-wi
  2. CA
  3. CA
  4. CA
  5. KW

Limitations and interpretation

  • This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
  • Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0). Every source is licensed for commercial use with attribution.
  • An announced or permitted build is not a contract, an open bid or a purchase order.
  • Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.

Cite or correct this record

Kapwork Grow, “APECS Data Center Campus (Former GM Assembly Plant)”, https://kapwork.com/grow/directory/datacenters/apecs-data-center-campus-former-gm-assembly-plant-wi-dc_2d56603b755f, materially updated Sep 24, 2026.

Report an error in this record and we will check it against the cited sources.

An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.