Cloverleaf Wrightstown Data Center Inquiry (Village of Wrightstown)
Cloverleaf Infrastructure has proposed a 1000 MW data center in Brown County, Wisconsin (proposed). 2 sources report this facility in the Kapwork Grow tracker.
- Capacity
- 1000 MW
Who's on this build
Named in the cited sources. No source reports who builds it.
- Other Cloverleaf Infrastructure builds
Operator
Cloverleaf Infrastructure
Timeline
Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.
- Today
Proposed
Last material change Sep 24, 2026.
- 4 mo ago
Announced
- 4 mo ago
Event date: · First observed: Not reported
Reported updates without an event date
Reported for 2026-01.
Event date: Not reported · First observed: Not reported
Record quality
- Datasets
- 2, figures differ
- Location
- Street address reported
- Summary
- From published records
- Source as of
- Last material change
Site and infrastructure
CA Compute AtlasSC Server CountryKW Kapwork Grow tracker record
Status
- Operator
- Cloverleaf Infrastructure
- Stage
- Proposed
- Facility type
- Enterprise
Scale
- Reported capacity
- 1000 MW
Reported dates
- Announced
- 2026-05-19Reported date — see the source for the event evidenced.
Site
- City
- Wrightstown
- County
- Brown
- State
- Wisconsin
- Location precision
- Street address reported
- Community response
- Local opposition reported
Sources, method and limits
Show 4 sourcesHide
What each source reports
| Dataset | Reported name | Reported status | Reported MW |
|---|---|---|---|
| Compute Atlas | Cloverleaf Wrightstown Data Center Inquiry (Village of Wrightstown) | Proposed | Not reported |
| Server Country | Cloverleaf Wrightstown Data Center Prospect | Proposed | 1000 MW |
Sources and evidence
- CACompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Sep 1, 2026 · Record: cloverleaf-wrightstown-village-wi
- CASpectrum News 1 Wisconsin (cited by Compute Atlas)As of: Sep 1, 2026
- CAWisconsin Watch (cited by Compute Atlas)As of: Sep 1, 2026
- SCServer Country project record (CC BY 4.0)As of: Sep 24, 2026 · Record: 0876
- KWKapwork Grow tracker record, merged from the sources listed here (free account)As of: Sep 23, 2026 · Record: 72823159743733
Limitations and interpretation
- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0) · Server Country, https://servercountry.org/data/ (CC BY 4.0). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.
Cite or correct this record
Kapwork Grow, “Cloverleaf Wrightstown Data Center Inquiry (Village of Wrightstown)”, https://kapwork.com/grow/directory/datacenters/cloverleaf-wrightstown-data-center-inquiry-village-of-wrightstown-wi-dc_423b769164f5, materially updated Sep 24, 2026.
Report an error in this record and we will check it against the cited sources.
An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.
More builds
Kapwork Grow
Every data center build in the directory, in one place.
Search by company, place or trade.