Cloverleaf Infrastructure has proposed a 1500 MW data center in Canadian County, Oklahoma (proposed). 2 sources report this facility in the Kapwork Grow tracker.
- Capacity
- 1500 MW
- Investment
- $1B
- Building area
- 2 sq ft
- Site
- 630 acres
- Reported jobs
- 300
Who's on this build
Named in the cited sources. No source reports who builds it.
- Other Cloverleaf Infrastructure builds
Operator
Cloverleaf Infrastructure
Timeline
Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.
- Today
Proposed
Last material change Sep 24, 2026.
- 4 mo ago
Announced
- 4 mo ago
Event date: · First observed: Not reported
Record quality
- Datasets
- 2, all agree
- Location
- Street address reported
- Summary
- From published records
- Source as of
- Last material change
Site and infrastructure
CA Compute AtlasSC Server CountryKW Kapwork Grow tracker record
Status
- Operator
- Cloverleaf Infrastructure
- Stage
- Proposed
- Facility type
- Enterprise
Scale
- Reported capacity
- 1500 MW
- Reported investment
- $1B
- Reported building area
- 2 sq ft
- Site area
- 630 acres
- Reported jobs
- 300
Reported dates
- Announced
- 2026-05-05Reported date — see the source for the event evidenced.
Site
- City
- Piedmont
- County
- Canadian
- State
- Oklahoma
- Location precision
- Street address reported
- Community response
- Local opposition reported
Power and cooling
- Cooling
- Closed loop
Sources, method and limits
Show 8 sourcesHide
What each source reports
| Dataset | Reported name | Reported status | Reported MW |
|---|---|---|---|
| Compute Atlas | Cloverleaf Project Open Sky | Proposed | 1500 MW |
| Server Country | Project Open Sky | Proposed | 1500 MW |
Sources and evidence
- CACompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Sep 14, 2026 · Record: cloverleaf-project-open-sky-piedmont-ok
- CAData Center Dynamics (cited by Compute Atlas)As of: Aug 6, 2026
- CAKFOR (cited by Compute Atlas)As of: Jul 11, 2026
- CAOklahoma Watch (cited by Compute Atlas)As of: Jul 11, 2026
- CAMore Than Just Parks Data Center Tracker (cited by Compute Atlas)As of: Aug 6, 2026
- CAKOKH FOX 25 (cited by Compute Atlas)As of: Sep 14, 2026
- CARadio Oklahoma News (cited by Compute Atlas)As of: Sep 14, 2026
- SCServer Country project record (CC BY 4.0)As of: Sep 24, 2026 · Record: 0791
- KWKapwork Grow tracker record, merged from the sources listed here (free account)As of: Sep 23, 2026 · Record: 202195844771483
Limitations and interpretation
- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0) · Server Country, https://servercountry.org/data/ (CC BY 4.0). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.
Cite or correct this record
Kapwork Grow, “Cloverleaf Project Open Sky”, https://kapwork.com/grow/directory/datacenters/cloverleaf-project-open-sky-ok-dc_b7e56380ae9b, materially updated Sep 24, 2026.
Report an error in this record and we will check it against the cited sources.
An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.
More builds
Kapwork Grow
Every data center build in the directory, in one place.
Search by company, place or trade.