Cloverleaf Troy Data Center Campus
Cloverleaf Infrastructure has proposed a 500 MW data center in Madison County, Illinois (proposed). 2 sources report this facility in the Kapwork Grow tracker.
- Capacity
- 500 MW
- Expected completion
- Dec 2028 (2028-12)
Who's on this build
Named in the cited sources. No source reports who builds it.
- Other Cloverleaf Infrastructure builds
Operator
Cloverleaf Infrastructure
Utility
Ameren Illinois
Schedule
Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.
- in ~2 yr
Expected completionPlanned
- Today
Proposed
Last material change Sep 24, 2026.
- 16 days ago
Event date: · First observed: Not reported
- 8 mo ago
Announced
- 8 mo ago
Event date: · First observed: Not reported
Reported updates without an event date
Reported for 2028-12.
Event date: Not reported · First observed: Not reported
Record quality
- Datasets
- 2, figures differ
- Location
- Street address reported
- Summary
- From published records
- Source as of
- Last material change
Site and infrastructure
CA Compute AtlasSC Server CountryKW Kapwork Grow tracker record
Status
- Operator
- Cloverleaf Infrastructure
- Stage
- Proposed
- Facility type
- Enterprise
Scale
- Reported capacity
- 500 MW
Reported dates
- Announced
- 2026-01-08Reported date — see the source for the event evidenced.
- Expected completion
- 2028-12
Site
- City
- Troy
- County
- Madison
- State
- Illinois
- Location precision
- Street address reported
Power and cooling
- Utility
- Ameren Illinois
- Power source
- Grid power
- Cooling
- Closed loop
Sources, method and limits
Show 4 sourcesHide
What each source reports
| Dataset | Reported name | Reported status | Reported MW |
|---|---|---|---|
| Compute Atlas | Cloverleaf Troy Data Center Campus | Proposed | 500 MW |
| Server Country | Cloverleaf Infrastructure - Troy Data Center | Cancelled | 500 MW |
Sources and evidence
- CACompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Sep 12, 2026 · Record: cloverleaf-troy-il
- CACity of Troy, Illinois (cited by Compute Atlas)As of: Sep 12, 2026
- CABelleville News-Democrat (via Yahoo News) (cited by Compute Atlas)As of: Sep 12, 2026
- SCServer Country project record (CC BY 4.0)As of: Sep 24, 2026 · Record: 0689
- KWKapwork Grow tracker record, merged from the sources listed here (free account)As of: Sep 23, 2026 · Record: 4547131519908
Limitations and interpretation
- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0) · Server Country, https://servercountry.org/data/ (CC BY 4.0). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.
Cite or correct this record
Kapwork Grow, “Cloverleaf Troy Data Center Campus”, https://kapwork.com/grow/directory/datacenters/cloverleaf-troy-data-center-campus-il-dc_0422b628b3a4, materially updated Sep 24, 2026.
Report an error in this record and we will check it against the cited sources.
An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.
More builds
Kapwork Grow
Every data center build in the directory, in one place.
Search by company, place or trade.