CenterSquare ORD2 - 2425 Busse Road
2425 Busse Road LLC has proposed a 25.9 MW data center in Cook County, Illinois (proposed). One source reports this facility in the Kapwork Grow tracker.
- Capacity
- 25.9 MW
- Investment
- $274.2M ($274.15M)
- Building area
- 111,906 sq ft
Who's on this build
Named in the cited sources. No source reports who builds it.
Operator
2425 Busse Road LLC
Timeline
Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.
- Today
Proposed
Last material change Sep 24, 2026.
- last year
Announced
Reported updates without an event date
Reported for 2025.
Event date: Not reported · First observed: Not reported
Record quality
- Datasets
- 1
- Location
- Approximate: city centroid
- Summary
- From published records
- Source as of
- Last material change
Site and infrastructure
SC Server CountryKW Kapwork Grow tracker record
Status
- Operator
- 2425 Busse Road LLC
- Stage
- Proposed
- Facility type
- Enterprise
Scale
- Reported capacity
- 25.9 MW
- Reported investment
- $274.15M
- Reported building area
- 111,906 sq ft
Reported dates
- Announced
- 2025
Site
- City
- Elk Grove Village
- County
- Cook County
- State
- Illinois
- Location precision
- Approximate: city centroid
Sources, method and limits
Show 1 sourceHide
What each source reports
| Dataset | Reported name | Reported status | Reported MW |
|---|---|---|---|
| Server Country | CenterSquare ORD2 - 2425 Busse Road | Proposed | 25.9 MW |
Sources and evidence
- SCServer Country project record (CC BY 4.0)As of: Sep 24, 2026 · Record: 0917
- KWKapwork Grow tracker record, merged from the sources listed here (free account)As of: Sep 23, 2026 · Record: 32058858129403
Limitations and interpretation
- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Server Country, https://servercountry.org/data/ (CC BY 4.0). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.
Cite or correct this record
Kapwork Grow, “CenterSquare ORD2 - 2425 Busse Road”, https://kapwork.com/grow/directory/datacenters/centersquare-ord2-2425-busse-road-il-dc_1d2848d9c7fb, materially updated Sep 24, 2026.
Report an error in this record and we will check it against the cited sources.
An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.
More builds
Kapwork Grow
Every data center build in the directory, in one place.
Search by company, place or trade.