CloudHQ Mount Prospect (ORD) Campus
CloudHQ is building a 252 MW data center in Cook County, Illinois (under construction). 2 sources report this facility in the Kapwork Grow tracker.
- Capacity
- 252 MW
- Investment
- $2.5B
- Building area
- 1.5M sq ft (1,500,000 sq ft)
- Site
- 50 acres
- IT load
- 252 MW
Who's on this build
Named in the cited sources. No source reports who builds it.
- Other CloudHQ builds
Operator
CloudHQ
Utility
ComEd
Schedule
Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.
- Today
Under construction
Last material change Sep 24, 2026.
- 2 yr ago
Expected completionPlanned
- ~4 yr ago
Announced
- ~4 yr ago
Construction start
Reported updates without an event date
Reported for 2026-07.
Event date: Not reported · First observed: Not reported
Reported for 2025-10.
Event date: Not reported · First observed: Not reported
Reported for 2024.
Event date: Not reported · First observed: Not reported
Record quality
- Datasets
- 2, figures differ
- Location
- Street address reported
- Summary
- From published records
- Source as of
- Last material change
Site and infrastructure
CA Compute AtlasSC Server CountryKW Kapwork Grow tracker record
Status
- Operator
- CloudHQ
- Stage
- Under construction
- Facility type
- Enterprise
Scale
- Reported capacity
- 252 MW
- Reported IT load
- 252 MW
- Reported investment
- $2.5B
- Reported building area
- 1,500,000 sq ft
- Site area
- 50 acres
- Reported jobs
- 450
Reported dates
- Announced
- 2022-08
- Construction start reported
- 2022-08
- Expected completion
- 2024
Site
- City
- Mount Prospect
- County
- Cook
- State
- Illinois
- Location precision
- Street address reported
Power and cooling
- Utility
- ComEd
- Power source
- Grid power
Permits and public records
- Incentives reported
- Property Tax Abatement; Tif; Cba
Sources, method and limits
Show 7 sourcesHide
What each source reports
| Dataset | Reported name | Reported status | Reported MW |
|---|---|---|---|
| Compute Atlas | CloudHQ Mount Prospect (ORD) Campus | Under construction | Not reported |
| Server Country | CloudHQ ORD Campus - Mount Prospect | Under construction | 252 MW |
Sources and evidence
- CACompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Aug 8, 2026 · Record: cloudhq-mount-prospect-ord-il
- CADatacenterDynamics (cited by Compute Atlas)As of: Aug 3, 2026
- CAData Center Frontier (cited by Compute Atlas)As of: Aug 3, 2026
- CADaily Energy Insider (cited by Compute Atlas)As of: Aug 3, 2026
- CADaily Herald (cited by Compute Atlas)As of: Aug 8, 2026
- CADaily Herald (cited by Compute Atlas)As of: Jul 16, 2026
- SCServer Country project record (CC BY 4.0)As of: Sep 24, 2026 · Record: 0145
- KWKapwork Grow tracker record, merged from the sources listed here (free account)As of: Sep 23, 2026 · Record: 182078985655822
Limitations and interpretation
- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0) · Server Country, https://servercountry.org/data/ (CC BY 4.0). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.
Cite or correct this record
Kapwork Grow, “CloudHQ Mount Prospect (ORD) Campus”, https://kapwork.com/grow/directory/datacenters/cloudhq-mount-prospect-ord-campus-il-dc_a5999142d60e, materially updated Sep 24, 2026.
Report an error in this record and we will check it against the cited sources.
An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.
More builds
Kapwork Grow
Every data center build in the directory, in one place.
Search by company, place or trade.