Data center buildProposed2 of 2 datasets agree

Atlas Compute AI Data Center Campus

Atlas Compute (infrastructure by Penguin Solutions)Fort Pierce, St. Lucie County, FLUpdated

Atlas Compute (infrastructure by Penguin Solutions) has proposed a 240 MW data center in St. Lucie County, Florida (proposed). 2 sources report this facility in the Kapwork Grow tracker.

Capacity
240 MW
Expected completion
2027

Who's on this build

Named in the cited sources. No source reports who builds it.

  • Operator

    Atlas Compute (infrastructure by Penguin Solutions)

Schedule

Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.

  1. next year

    Expected completionPlanned

  2. Today

    Proposed

    Last material change Sep 24, 2026.

  3. 10 mo ago

    Announced

  4. 10 mo ago

    Reported as announced

    Event date: · First observed: Not reported

Reported updates without an event date

Record quality

Datasets
2, all agree
Location
Street address reported
Summary
From published records
Source as of
Last material change

Site and infrastructure

CA Compute AtlasSC Server CountryKW Kapwork Grow tracker record

Status

Operator
Atlas Compute (infrastructure by Penguin Solutions)Operator · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 14, 2026 · Record: atlas-compute-ai-data-center-campus-fort-pierce-flOperator · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0662
Stage
ProposedStage · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 14, 2026 · Record: atlas-compute-ai-data-center-campus-fort-pierce-flStage · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0662
Facility type
AI data centerFacility type · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 37794709017529

Scale

Reported capacity
240 MWReported capacity · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 14, 2026 · Record: atlas-compute-ai-data-center-campus-fort-pierce-flReported capacity · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0662

Reported dates

Announced
2025-11-06Announced · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 14, 2026 · Record: atlas-compute-ai-data-center-campus-fort-pierce-flReported date — see the source for the event evidenced.
Expected completion
2027Expected completion · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0662

Site

City
Fort PierceCity · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 14, 2026 · Record: atlas-compute-ai-data-center-campus-fort-pierce-flCity · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0662
County
St. LucieCounty · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 14, 2026 · Record: atlas-compute-ai-data-center-campus-fort-pierce-flCounty · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0662
State
FloridaState · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 14, 2026 · Record: atlas-compute-ai-data-center-campus-fort-pierce-flState · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0662
Location precision
Street address reportedLocation precision · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 37794709017529

Power and cooling

Power source
On-site natural gas generationPower source · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 37794709017529
Cooling
Air cooledCooling · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 37794709017529
AI workload
AI or machine-learning workload reportedAI workload · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 37794709017529

Sources, method and limits

Show 6 sourcesHide

What each source reports

What each source reports
DatasetReported nameReported statusReported MW
Compute AtlasAtlas Compute AI Data Center CampusProposed240 MW
Server CountryAtlas Compute AI Data Center CampusProposed240 MW

Sources and evidence

  1. CA
    Compute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Sep 14, 2026 · Record: atlas-compute-ai-data-center-campus-fort-pierce-fl
  2. CA
  3. CA
  4. CA
  5. CA
  6. SC
    Server Country project record (CC BY 4.0)As of: Sep 24, 2026 · Record: 0662
  7. KW

Limitations and interpretation

  • This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
  • Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0) · Server Country, https://servercountry.org/data/ (CC BY 4.0). Every source is licensed for commercial use with attribution.
  • An announced or permitted build is not a contract, an open bid or a purchase order.
  • Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.

Cite or correct this record

Kapwork Grow, “Atlas Compute AI Data Center Campus”, https://kapwork.com/grow/directory/datacenters/atlas-compute-ai-data-center-campus-fl-dc_225fc43493b9, materially updated Sep 24, 2026.

Report an error in this record and we will check it against the cited sources.

An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.