Cielo Haines City Data Center
Cielo Digital Infrastructure has proposed a 300 MW data center in Polk County, Florida (proposed). 2 sources report this facility in the Kapwork Grow tracker.
- Capacity
- 300 MW
- Site
- 74 acres
Who's on this build
Named in the cited sources. No source reports who builds it.
- Other Cielo Digital Infrastructure builds
Operator
Cielo Digital Infrastructure
Timeline
Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.
- Today
Proposed
Last material change Sep 24, 2026.
- 15 mo ago
Announced
Reported updates without an event date
Reported for 2026-07.
Event date: Not reported · First observed: Not reported
Reported for 2026-06.
Event date: Not reported · First observed: Not reported
Reported for 2025-11.
Event date: Not reported · First observed: Not reported
Record quality
- Datasets
- 2, all agree
- Location
- Street address reported
- Summary
- From published records
- Source as of
- Last material change
Site and infrastructure
CA Compute AtlasSC Server CountryKW Kapwork Grow tracker record
Status
- Operator
- Cielo Digital Infrastructure
- Stage
- Proposed
- Facility type
- AI data center
Scale
- Reported capacity
- 300 MW
- Site area
- 74 acres
Reported dates
- Announced
- 2025-06-24Reported date — see the source for the event evidenced.
Site
- City
- Haines City
- County
- Polk
- State
- Florida
- Location precision
- Street address reported
- Community response
- Local opposition reported
Power and cooling
- AI workload
- Likely AI or machine-learning workload
Sources, method and limits
Show 6 sourcesHide
What each source reports
| Dataset | Reported name | Reported status | Reported MW |
|---|---|---|---|
| Compute Atlas | Cielo Haines City Data Center | Proposed | 300 MW |
| Server Country | Cielo Haines City Data Center | Proposed | 300 MW |
Sources and evidence
- CACompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Sep 14, 2026 · Record: cielo-haines-city-fl
- CAYahoo Finance (syndicating Data Center Dynamics) (cited by Compute Atlas)As of: Sep 14, 2026
- CAThe Citrus Tea (cited by Compute Atlas)As of: Aug 2, 2026
- CAData Center Dynamics (cited by Compute Atlas)As of: Aug 2, 2026
- CAReport cited by Compute AtlasAs of: Sep 10, 2026
- SCServer Country project record (CC BY 4.0)As of: Sep 24, 2026 · Record: 0667
- KWKapwork Grow tracker record, merged from the sources listed here (free account)As of: Sep 23, 2026 · Record: 168456063883393
Limitations and interpretation
- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0) · Server Country, https://servercountry.org/data/ (CC BY 4.0). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.
Cite or correct this record
Kapwork Grow, “Cielo Haines City Data Center”, https://kapwork.com/grow/directory/datacenters/cielo-haines-city-data-center-fl-dc_9935bbd91881, materially updated Sep 24, 2026.
Report an error in this record and we will check it against the cited sources.
An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.
More builds
Kapwork Grow
Every data center build in the directory, in one place.
Search by company, place or trade.