Cielo Montgomery County AI Campus
Cielo Digital Infrastructure has proposed a 350 MW data center in Montgomery County, Tennessee (proposed). One source reports this facility in the Kapwork Grow tracker.
- Capacity
- 350 MW
- Site
- 107 acres
Who's on this build
Named in the cited sources. No source reports who builds it.
- Other Cielo Digital Infrastructure builds
Operator
Cielo Digital Infrastructure
Utility
Clarksville (CDE Lightband)
Timeline
Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.
Reported updates without an event date
Reported for 2026.
Event date: Not reported · First observed: Not reported
Record quality
- Datasets
- 1
- Location
- Site footprint confirmed
- Summary
- From published records
- Source as of
- Last material change
Site and infrastructure
CA Compute AtlasKW Kapwork Grow tracker record
Status
- Operator
- Cielo Digital Infrastructure
- Stage
- Proposed
- Facility type
- AI data center
Scale
- Reported capacity
- 350 MW
- Site area
- 107 acres
Site
- City
- Clarksville
- County
- Montgomery
- State
- Tennessee
- Location precision
- Site footprint confirmed
Power and cooling
- Utility
- Clarksville (CDE Lightband)
- Power source
- Grid power
- AI workload
- Likely AI or machine-learning workload
Sources, method and limits
Show 4 sourcesHide
What each source reports
| Dataset | Reported name | Reported status | Reported MW |
|---|---|---|---|
| Compute Atlas | Cielo Montgomery County AI Campus | Proposed | 350 MW |
Sources and evidence
- CACompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Jul 23, 2026 · Record: cielo-clarksville-tn
- CACleanview (cited by Compute Atlas)As of: Jul 7, 2026
- CACielo Digital Infrastructure (cited by Compute Atlas)As of: Jul 7, 2026
- CAOak Ridge National Laboratory (ORNL) / HIFLD (cited by Compute Atlas)As of: Jul 23, 2026
- KWKapwork Grow tracker record, merged from the sources listed here (free account)As of: Sep 23, 2026 · Record: 147861876600991
Limitations and interpretation
- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.
Cite or correct this record
Kapwork Grow, “Cielo Montgomery County AI Campus”, https://kapwork.com/grow/directory/datacenters/cielo-montgomery-county-ai-campus-tn-dc_867ac6a1709f, materially updated Sep 24, 2026.
Report an error in this record and we will check it against the cited sources.
An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.
More builds
Kapwork Grow
Every data center build in the directory, in one place.
Search by company, place or trade.