Bitdeer Knoxville AI Datacenter (5101 S. National Drive)
Bitdeer is building a 86 MW data center in Knox County, Tennessee (under construction). 2 sources report this facility in the Kapwork Grow tracker.
- Capacity
- 86 MW
- Site
- 10 acres
Who's on this build
Named in the cited sources. No source reports who builds it.
- Other Bitdeer builds
Operator
Bitdeer
Utility
Knoxville Utilities Board
Timeline
Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.
- Today
Under construction
Last material change Sep 24, 2026.
- 5 mo ago
Construction start
- 5 mo ago
Event date: · First observed: Not reported
Record quality
- Datasets
- 1
- Location
- Street address reported
- Summary
- From published records
- Source as of
- Last material change
Site and infrastructure
CA Compute AtlasPE Public Evidence ProjectKW Kapwork Grow tracker record
Status
- Operator
- Bitdeer
- Stage
- Under construction
- Facility type
- Enterprise
Scale
- Reported capacity
- 86 MW
- Site area
- 10 acres
Reported dates
- Construction start reported
- 2026-04-30Reported date — see the source for the event evidenced.
Site
- City
- Knoxville
- County
- Knox
- State
- Tennessee
- Location precision
- Street address reported
Power and cooling
- Utility
- Knoxville Utilities Board
Permits and public records
- Government records on file
- 1
Sources, method and limits
Show 4 sourcesHide
What each source reports
| Dataset | Reported name | Reported status | Reported MW |
|---|---|---|---|
| Compute Atlas | Bitdeer Knoxville AI Datacenter (5101 S. National Drive) | Under construction | 86 MW |
Sources and evidence
- CACompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Jul 23, 2026 · Record: bitdeer-knoxville-tn
- CA
- CAOak Ridge National Laboratory (ORNL) / HIFLD (cited by Compute Atlas)As of: Jul 23, 2026
- PEPublic Evidence Project: Filing from SEC EDGAR (Bitdeer Technologies Group, CIK 0001899123)As of: Aug 6, 2026 · Record: source-bitdeer-knoxville-tn
- KWKapwork Grow tracker record, merged from the sources listed here (free account)As of: Sep 23, 2026 · Record: 109259618472580
Limitations and interpretation
- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0) · Public Evidence Project, U.S. Data Center Public Records Dataset, https://publicevidence.org/data/national-data-center-public-records (CC BY 4.0). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.
Cite or correct this record
Kapwork Grow, “Bitdeer Knoxville AI Datacenter (5101 S. National Drive)”, https://kapwork.com/grow/directory/datacenters/bitdeer-knoxville-ai-datacenter-5101-s-national-drive-tn-dc_635efcbf5284, materially updated Sep 24, 2026.
Report an error in this record and we will check it against the cited sources.
An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.