Bitdeer Clarington HPC/AI Campus
Bitdeer is building a 570 MW data center in Monroe County, Ohio (under construction). 2 sources report this facility in the Kapwork Grow tracker.
- Capacity
- 570 MW
Who's on this build
Named in the cited sources. No source reports who builds it.
- Other Bitdeer builds
Operator
Bitdeer
Utility
AEP Ohio
Timeline
Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.
- Today
Under construction
Last material change Sep 24, 2026.
- 10 mo ago
Construction start
Reported updates without an event date
Reported for 2025-11.
Event date: Not reported · First observed: Not reported
Record quality
- Datasets
- 1
- Location
- Site footprint confirmed
- Summary
- From published records
- Source as of
- Last material change
Site and infrastructure
CA Compute AtlasPE Public Evidence ProjectKW Kapwork Grow tracker record
Status
- Operator
- Bitdeer
- Stage
- Under construction
- Facility type
- AI data center
Scale
- Reported capacity
- 570 MW
Reported dates
- Construction start reported
- 2025-11
Site
- City
- Clarington
- County
- Monroe
- State
- Ohio
- Location precision
- Site footprint confirmed
- Community response
- Local opposition reported
Power and cooling
- Utility
- AEP Ohio
- Power source
- Grid power
- AI workload
- Likely AI or machine-learning workload
Permits and public records
- Government records on file
- 1
Sources, method and limits
Show 7 sourcesHide
What each source reports
| Dataset | Reported name | Reported status | Reported MW |
|---|---|---|---|
| Compute Atlas | Bitdeer Clarington HPC/AI Campus | Under construction | 570 MW |
Sources and evidence
- CACompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Sep 9, 2026 · Record: bitdeer-clarington-oh
- CABitdeer Technologies Group (cited by Compute Atlas)As of: Jul 7, 2026
- CAGlobeNewswire / Bitdeer (cited by Compute Atlas)As of: Jul 8, 2026
- CAGlobeNewswire / Bitdeer (cited by Compute Atlas)As of: Jul 8, 2026
- CAU.S. Securities and Exchange Commission (cited by Compute Atlas)As of: Jul 8, 2026
- CABitdeer Technologies Group via GlobeNewswire (cited by Compute Atlas)As of: Sep 9, 2026
- PEPublic Evidence Project: Filing from U.S. Securities and Exchange CommissionAs of: Aug 6, 2026 · Record: source-bitdeer-clarington-oh
- KWKapwork Grow tracker record, merged from the sources listed here (free account)As of: Sep 23, 2026 · Record: 252933255507543
Limitations and interpretation
- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0) · Public Evidence Project, U.S. Data Center Public Records Dataset, https://publicevidence.org/data/national-data-center-public-records (CC BY 4.0). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.
Cite or correct this record
Kapwork Grow, “Bitdeer Clarington HPC/AI Campus”, https://kapwork.com/grow/directory/datacenters/bitdeer-clarington-hpc-ai-campus-oh-dc_e60a9cd8ae57, materially updated Sep 24, 2026.
Report an error in this record and we will check it against the cited sources.
An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.