5C Group / Vultr Data Center (Prime Ohio)
5C Group (Hypertec Cloud + 5C Data Centers); tenant Vultr (The Constant Company, LLC) is building a 150 MW data center in Clark County, Ohio (under construction). One source reports this facility in the Kapwork Grow tracker.
- Capacity
- 150 MW
- Investment
- $1.3B
- Reported jobs
- 120
Who's on this build
Named in the cited sources. No source reports who builds it.
Operator
5C Group (Hypertec Cloud + 5C Data Centers); tenant Vultr (The Constant Company, LLC)
Utility
Ohio Edison / FirstEnergy
Record quality
- Datasets
- 1
- Location
- Street address reported
- Summary
- From published records
- Source as of
- Last material change
Site and infrastructure
CA Compute AtlasKW Kapwork Grow tracker record
Status
- Operator
- 5C Group (Hypertec Cloud + 5C Data Centers); tenant Vultr (The Constant Company, LLC)
- Stage
- Under construction
- Facility type
- AI data center
Scale
- Reported capacity
- 150 MW
- Reported investment
- $1.3B
- Reported jobs
- 120
Site
- City
- Springfield
- County
- Clark
- State
- Ohio
- Location precision
- Street address reported
Power and cooling
- Utility
- Ohio Edison / FirstEnergy
- Power source
- Grid power
- AI workload
- Confirmed AI or machine-learning workload
Permits and public records
- Incentives reported
- Enterprise Zone property tax abatement (City of Springfield) $95,000,000; Ohio Tax Credit Authority -- 10-year 50% Job Creation Tax Credit (State of Ohio) $32,000,000
Sources, method and limits
Show 6 sourcesHide
What each source reports
| Dataset | Reported name | Reported status | Reported MW |
|---|---|---|---|
| Compute Atlas | 5C Group / Vultr Data Center (Prime Ohio) | Under construction | 150 MW |
Sources and evidence
- CACompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Aug 2, 2026 · Record: 5c-group-vultr-prime-ohio-springfield-oh
- CAWYSO (cited by Compute Atlas)As of: Aug 2, 2026
- CAJobsOhio (cited by Compute Atlas)As of: Aug 2, 2026
- CACity of Springfield (cited by Compute Atlas)As of: Aug 2, 2026
- CAData Center Dynamics (cited by Compute Atlas)As of: Aug 2, 2026
- CASpringfield News-Sun (cited by Compute Atlas)As of: Aug 2, 2026
- KWKapwork Grow tracker record, merged from the sources listed here (free account)As of: Sep 23, 2026 · Record: 39969186416699
Limitations and interpretation
- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.
Cite or correct this record
Kapwork Grow, “5C Group / Vultr Data Center (Prime Ohio)”, https://kapwork.com/grow/directory/datacenters/5c-group-vultr-data-center-prime-ohio-oh-dc_245a0d28883b, materially updated Sep 24, 2026.
Report an error in this record and we will check it against the cited sources.
An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.
More builds
Kapwork Grow
Every data center build in the directory, in one place.
Search by company, place or trade.