5C MEM01 Memphis (former Fred's headquarters)
5C Data Centers is building a 15 MW data center in Shelby County, Tennessee (under construction). One source reports this facility in the Kapwork Grow tracker.
- Capacity
- 15 MW
- Investment
- $152M
- Site
- 59 acres
- Reported jobs
- 15
Who's on this build
Named in the cited sources. No source reports who builds it.
- Other 5C Data Centers builds
Operator
5C Data Centers
Timeline
Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.
- Today
Under construction
Last material change Sep 24, 2026.
- 14 days ago
Construction start
- 14 days ago
Event date: · First observed: Not reported
Record quality
- Datasets
- 1
- Location
- Street address reported
- Summary
- From published records
- Source as of
- Last material change
Site and infrastructure
CA Compute AtlasKW Kapwork Grow tracker record
Status
- Operator
- 5C Data Centers
- Stage
- Under construction
- Facility type
- Enterprise
Scale
- Reported capacity
- 15 MW
- Reported investment
- $152M
- Site area
- 59 acres
- Reported jobs
- 15
Reported dates
- Construction start reported
- 2026-09-14Reported date — see the source for the event evidenced.
Site
- City
- Memphis
- County
- Shelby
- State
- Tennessee
- Location precision
- Street address reported
Power and cooling
- AI workload
- Mixed use, AI among other workloads
Sources, method and limits
Show 5 sourcesHide
What each source reports
| Dataset | Reported name | Reported status | Reported MW |
|---|---|---|---|
| Compute Atlas | 5C MEM01 Memphis (former Fred's headquarters) | Under construction | 15 MW |
Sources and evidence
- CACompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Sep 14, 2026 · Record: 5c-mem01-memphis-tn
- CADataCenterDynamics (archived) (cited by Compute Atlas)As of: Sep 9, 2026
- CAWe Are Memphis (Greater Memphis Chamber) (cited by Compute Atlas)As of: Sep 14, 2026
- CAFOX13 Memphis (cited by Compute Atlas)As of: Sep 14, 2026
- CAFOX13 Memphis (cited by Compute Atlas)As of: Sep 14, 2026
- KWKapwork Grow tracker record, merged from the sources listed here (free account)As of: Sep 23, 2026 · Record: 175744415490704
Limitations and interpretation
- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.
Cite or correct this record
Kapwork Grow, “5C MEM01 Memphis (former Fred's headquarters)”, https://kapwork.com/grow/directory/datacenters/5c-mem01-memphis-former-fred-s-headquarters-tn-dc_9fd6af74e290, materially updated Sep 24, 2026.
Report an error in this record and we will check it against the cited sources.
An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.
More builds
Kapwork Grow
Every data center build in the directory, in one place.
Search by company, place or trade.