AUS 01 02 03 Data Center
Paile LLC has approval for a data center in Texas (approved). One source reports this facility in the Kapwork Grow tracker.
Who's on this build
Named in the cited sources. No source reports who builds it.
- Other Paile LLC builds
Operator
Paile LLC
Timeline
Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.
- Today
Approved
Last material change Sep 24, 2026.
- 42 days ago
Announced
- 42 days ago
Event date: · First observed: Not reported
Record quality
- Datasets
- 1
- Summary
- From published records
- Source as of
- Last material change
Site and infrastructure
TX Texas Comptroller data center listKW Kapwork Grow tracker record
Status
- Operator
- Paile LLC
- Stage
- Approved
- Facility type
- Enterprise
Reported dates
- Announced
- 2026-08-17Reported date — see the source for the event evidenced.
Site
- State
- Texas
Permits and public records
- Texas Comptroller registration
- LD088449, certified 2026-08-17
Sources, method and limits
Show 1 sourceHide
What each source reports
| Dataset | Reported name | Reported status | Reported MW |
|---|---|---|---|
| Texas Comptroller | AUS 01 02 03 Data Center | Registered, certified 2026-08-17 | Not reported |
Sources and evidence
- TXTexas Comptroller qualifying data center registration (Texas public record)As of: Aug 17, 2026 · Record: LD088449
- KWKapwork Grow tracker record, merged from the sources listed here (free account)As of: Sep 23, 2026 · Record: 214321500907501
Limitations and interpretation
- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Texas Comptroller of Public Accounts, data center lists (Texas public record). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.
Cite or correct this record
Kapwork Grow, “AUS 01 02 03 Data Center”, https://kapwork.com/grow/directory/datacenters/aus-01-02-03-data-center-tx-dc_c2ec9cede7ed, materially updated Sep 24, 2026.
Report an error in this record and we will check it against the cited sources.
An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.
More builds
Kapwork Grow
Every data center build in the directory, in one place.
Search by company, place or trade.