Skip to content
Data center buildUnder construction

AUS02 / Cedar Creek Campus

EdgeConneXCedar Creek, Bastrop County, TXUpdated

EdgeConneX is building a 384 MW data center in Bastrop County, Texas (under construction). One source reports this facility in the Kapwork Grow tracker.

Capacity
384 MW
Investment
$1.4B
Site
140 acres

Who's on this build

Named in the cited sources. No source reports who builds it.

Timeline

Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.

  1. Today

    Under construction

    Last material change Sep 24, 2026.

  2. 6 mo ago

    Construction start

  3. 6 mo ago

    Construction start reported

    Event date: · First observed: Not reported

Record quality

Datasets
1
Location
Site footprint confirmed
Summary
From published records
Source as of
Last material change

Site and infrastructure

CA Compute AtlasKW Kapwork Grow tracker record

Status

Operator
EdgeConneXOperator · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Aug 16, 2026 · Record: edgeconnex-cedar-creek-tx
Stage
Under constructionStage · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Aug 16, 2026 · Record: edgeconnex-cedar-creek-tx
Facility type
EnterpriseFacility type · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 88883205205350

Scale

Reported capacity
384 MWReported capacity · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Aug 16, 2026 · Record: edgeconnex-cedar-creek-tx
Reported investment
$1.4BReported investment · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 88883205205350
Site area
140 acresSite area · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 88883205205350

Reported dates

Construction start reported
2026-03-31Construction start reported · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Aug 16, 2026 · Record: edgeconnex-cedar-creek-txReported date — see the source for the event evidenced.

Site

City
Cedar CreekCity · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Aug 16, 2026 · Record: edgeconnex-cedar-creek-tx
County
BastropCounty · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Aug 16, 2026 · Record: edgeconnex-cedar-creek-tx
State
TexasState · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Aug 16, 2026 · Record: edgeconnex-cedar-creek-tx
Location precision
Site footprint confirmedLocation precision · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 88883205205350

Sources, method and limits

Show 4 sourcesHide

What each source reports

What each source reports
DatasetReported nameReported statusReported MW
Compute AtlasAUS02 / Cedar Creek CampusUnder construction384 MW

Sources and evidence

  1. CA
    Compute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Aug 16, 2026 · Record: edgeconnex-cedar-creek-tx
  2. CA
  3. CA
  4. CA
  5. KW

Limitations and interpretation

  • This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
  • Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0). Every source is licensed for commercial use with attribution.
  • An announced or permitted build is not a contract, an open bid or a purchase order.
  • Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.

Cite or correct this record

Kapwork Grow, “AUS02 / Cedar Creek Campus”, https://kapwork.com/grow/directory/datacenters/aus02-cedar-creek-campus-tx-dc_50d6bbdf6d66, materially updated Sep 24, 2026.

Report an error in this record and we will check it against the cited sources.

An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.

More builds

Kapwork Grow

Every data center build in the directory, in one place.

Search by company, place or trade.

Browse all builds