AWS Clinton Data Center
Amazon Web Services is building a 109.5 MW data center in Hinds County, Mississippi (under construction). 2 sources report this facility in the Kapwork Grow tracker.
- Capacity
- 109.5 MW
- Investment
- $1B
- Building area
- 730,000 sq ft
- Expected completion
- Oct 2028 (2028-10)
- Reported jobs
- 100
Who's on this build
Named in the cited sources. No source reports who builds it.
- Other Amazon Web Services builds
Operator
Amazon Web Services
Utility
Entergy Mississippi
Schedule
Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.
- in ~2 yr
Expected completionPlanned
- Today
Under construction
Last material change Sep 24, 2026.
- 3 mo ago
Construction start
- 3 mo ago
Event date: · First observed: Not reported
- 5 mo ago
Announced
- 5 mo ago
Event date: · First observed: Not reported
Reported updates without an event date
Reported for 2028-10.
Event date: Not reported · First observed: Not reported
Record quality
- Datasets
- 2, figures differ
- Location
- Street address reported
- Summary
- From published records
- Source as of
- Last material change
Site and infrastructure
CA Compute AtlasSC Server CountryKW Kapwork Grow tracker record
Status
- Operator
- Amazon Web Services
- Stage
- Under construction
- Facility type
- AI data center
Scale
- Reported capacity
- 109.5 MWEstimate
- Reported investment
- $1B
- Reported building area
- 730,000 sq ft
- Reported jobs
- 100
Reported dates
- Announced
- 2026-04-09Reported date — see the source for the event evidenced.
- Construction start reported
- 2026-06-12Reported date — see the source for the event evidenced.
- Expected completion
- 2028-10
Site
- City
- Clinton
- County
- Hinds
- State
- Mississippi
- Location precision
- Street address reported
Power and cooling
- Utility
- Entergy Mississippi
- Power source
- Grid power
- Cooling
- Closed loop
- AI workload
- Likely AI or machine-learning workload
Permits and public records
- Incentives reported
- Fee-in-Lieu of Taxes (FILOT): 67% reduction in annual ad valorem taxes for 10 years once operational, plus a two-thirds reduction on taxes on in-building property such as servers for a further 20 years; payments split proportionally among the city, county and school district; agreement terminates if construction has not commenced by January 1, 2031 (City of Clinton and Hinds County, Mississippi)
Sources, method and limits
Show 9 sourcesHide
What each source reports
| Dataset | Reported name | Reported status | Reported MW |
|---|---|---|---|
| Compute Atlas | AWS Clinton Data Center | Under construction | Not reported |
| Server Country | AWS Clinton Data Center Project | Proposed | Not reported |
Sources and evidence
- CACompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Sep 14, 2026 · Record: aws-clinton-hinds-ms
- CAAbout Amazon (cited by Compute Atlas)As of: Sep 9, 2026
- CAEntergy (cited by Compute Atlas)As of: Sep 9, 2026
- CACity of Clinton, Mississippi (cited by Compute Atlas)As of: Sep 9, 2026
- CAThe Mississippi Monitor (cited by Compute Atlas)As of: Sep 9, 2026
- CAWLBT (cited by Compute Atlas)As of: Sep 14, 2026
- CA
- CAWLBT (cited by Compute Atlas)As of: Sep 14, 2026
- SCServer Country project record (CC BY 4.0)As of: Sep 24, 2026 · Record: 0600
- KWKapwork Grow tracker record, merged from the sources listed here (free account)As of: Sep 23, 2026 · Record: 113317761424555
Limitations and interpretation
- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0) · Server Country, https://servercountry.org/data/ (CC BY 4.0). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.
- Capacity is estimated by the tracker from reported floor area at 150 W per square foot.
Cite or correct this record
Kapwork Grow, “AWS Clinton Data Center”, https://kapwork.com/grow/directory/datacenters/aws-clinton-data-center-ms-dc_670fd8ea9cab, materially updated Sep 24, 2026.
Report an error in this record and we will check it against the cited sources.
An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.