AWS Project Green Campus
Amazon Web Services is building a 1316.3 MW data center in Montgomery County, Missouri (under construction). 2 sources report this facility in the Kapwork Grow tracker.
- Capacity
- 1316.3 MW
- Investment
- $10B
- Building area
- 4 sq ft
- Site
- 1,000 acres
- Expected completion
- 2032
Who's on this build
Named in the cited sources. No source reports who builds it.
- Other Amazon Web Services builds
Operator
Amazon Web Services
Utility
Ameren Missouri
Schedule
Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.
- in 6 yr
Expected completionPlanned
- Today
Under construction
Last material change Sep 24, 2026.
- 4 mo ago
Announced
- 4 mo ago
Event date: · First observed: Not reported
- 5 mo ago
Construction start
Reported updates without an event date
Reported for 2032.
Event date: Not reported · First observed: Not reported
Reported for 2026-04.
Event date: Not reported · First observed: Not reported
Record quality
- Datasets
- 2, figures differ
- Location
- Site footprint confirmed
- Summary
- From published records
- Source as of
- Last material change
Site and infrastructure
CA Compute AtlasSC Server CountryKW Kapwork Grow tracker record
Status
- Operator
- Amazon Web Services
- Stage
- Under construction
- Facility type
- AI data center
Scale
- Reported capacity
- 1316.3 MW
- Reported investment
- $10B
- Reported building area
- 4 sq ft
- Site area
- 1,000 acres
Reported dates
- Announced
- 2026-05-20Reported date — see the source for the event evidenced.
- Construction start reported
- 2026-04
- Expected completion
- 2032
Site
- City
- New Florence
- County
- Montgomery
- State
- Missouri
- Location precision
- Site footprint confirmed
- Community response
- Local opposition reported
Power and cooling
- Utility
- Ameren Missouri
- Power source
- Grid power
- AI workload
- Likely AI or machine-learning workload
Permits and public records
- Incentives reported
- Montgomery County Chapter 100 bond / PILOT — personal property tax abatements on declining schedule approved December 2025; real property taxes paid in full; public safety districts (ambulance, fire) opted out and retain full allocations. Total multi-year abatement value not publicly disclosed. (Montgomery County, MO)
Sources, method and limits
Show 9 sourcesHide
What each source reports
| Dataset | Reported name | Reported status | Reported MW |
|---|---|---|---|
| Compute Atlas | AWS Project Green Campus | Under construction | Not reported |
| Server Country | Amazon Project Green New Florence Data Center Campus | Proposed | 1316.3 MW |
Sources and evidence
- CACompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Jul 7, 2026 · Record: aws-green-new-florence-mo
- CAKOMU (cited by Compute Atlas)As of: Jul 7, 2026
- CAData Center Dynamics (cited by Compute Atlas)As of: Jul 7, 2026
- CAData Center Dynamics (cited by Compute Atlas)As of: Jul 7, 2026
- CAThe Missouri Times (cited by Compute Atlas)As of: Jul 7, 2026
- CAKQ2 (cited by Compute Atlas)As of: Jul 7, 2026
- CAABC17 News (cited by Compute Atlas)As of: Jul 7, 2026
- CABaxtel (cited by Compute Atlas)As of: Jul 7, 2026
- SCServer Country project record (CC BY 4.0)As of: Sep 24, 2026 · Record: 0751
- KWKapwork Grow tracker record, merged from the sources listed here (free account)As of: Sep 23, 2026 · Record: 33154921024233
Limitations and interpretation
- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0) · Server Country, https://servercountry.org/data/ (CC BY 4.0). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.
Cite or correct this record
Kapwork Grow, “AWS Project Green Campus”, https://kapwork.com/grow/directory/datacenters/aws-project-green-campus-mo-dc_1e277b4a4ae9, materially updated Sep 24, 2026.
Report an error in this record and we will check it against the cited sources.
An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.
More builds
Kapwork Grow
Every data center build in the directory, in one place.
Search by company, place or trade.