AWS Wallula Gap Campus

Amazon Web ServicesWallula, Walla Walla County, WAUpdated

Amazon Web Services has proposed a 300 MW data center in Walla Walla County, Washington (proposed). 2 sources report this facility in the Kapwork Grow tracker.

Capacity
300 MW
Investment
$4.8B
Building area
3.4M sq ft (3,400,000 sq ft)
Site
500 acres
Expected completion
2028

Who's on this build

Named in the cited sources. No source reports who builds it.

Schedule

Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.

  1. in 2 yr

    Expected completionPlanned

  2. this year

    Construction start

  3. Today

    Proposed

    Last material change Sep 24, 2026.

  4. 23 days ago

    Reported as announced

    Event date: · First observed: Not reported

  5. ~2 yr ago

    Announced

Reported updates without an event date

Record quality

Datasets
2, figures differ
Location
Site footprint confirmed
Summary
From published records
Source as of
Last material change

Site and infrastructure

CA Compute AtlasSC Server CountryKW Kapwork Grow tracker record

Status

Operator
Amazon Web ServicesOperator · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 14, 2026 · Record: aws-wallula-gap-walla-walla-waOperator · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0550
Tenants
Amazon Data Services / AWSTenants · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 155256684565693
Stage
ProposedStage · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 14, 2026 · Record: aws-wallula-gap-walla-walla-waStage · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0550
Facility type
AI data centerFacility type · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 155256684565693

Scale

Reported capacity
300 MWReported capacity · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 14, 2026 · Record: aws-wallula-gap-walla-walla-wa
Capacity as the sources range
100 to 300 MWCapacity as the sources range · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 14, 2026 · Record: aws-wallula-gap-walla-walla-waCapacity as the sources range · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0550
Reported investment
$4.8BReported investment · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 155256684565693
Reported building area
3,400,000 sq ftReported building area · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 155256684565693
Site area
500 acresSite area · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 155256684565693
Reported jobs
320Reported jobs · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 155256684565693

Reported dates

Announced
2024-10Announced · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 14, 2026 · Record: aws-wallula-gap-walla-walla-wa
Construction start reported
2026Construction start reported · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 14, 2026 · Record: aws-wallula-gap-walla-walla-wa
Expected completion
2028Expected completion · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0550

Site

City
WallulaCity · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 14, 2026 · Record: aws-wallula-gap-walla-walla-waCity · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0550
County
Walla WallaCounty · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 14, 2026 · Record: aws-wallula-gap-walla-walla-waCounty · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0550
State
WashingtonState · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 14, 2026 · Record: aws-wallula-gap-walla-walla-waState · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0550
Location precision
Site footprint confirmedLocation precision · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 155256684565693

Power and cooling

Utility
Columbia Rural Electric Assn, IncUtility · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 155256684565693
Power source
Grid powerPower source · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 155256684565693
Cooling
HybridCooling · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 155256684565693
AI workload
Confirmed AI or machine-learning workloadAI workload · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 14, 2026 · Record: aws-wallula-gap-walla-walla-wa

Permits and public records

Incentives reported
Infrastructure SupportIncentives reported · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 155256684565693

Sources, method and limits

Show 9 sourcesHide

What each source reports

What each source reports
DatasetReported nameReported statusReported MW
Compute AtlasAWS Wallula Gap CampusProposed300 MW
Server CountryPort of Walla Walla - Project ForestProposed100 MW

Sources and evidence

  1. CA
    Compute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Sep 14, 2026 · Record: aws-wallula-gap-walla-walla-wa
  2. CA
  3. CA
  4. CA
  5. CA
  6. CA
  7. CA
  8. CA
  9. SC
    Server Country project record (CC BY 4.0)As of: Sep 24, 2026 · Record: 0550
  10. KW

Limitations and interpretation

  • This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
  • Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0) · Server Country, https://servercountry.org/data/ (CC BY 4.0). Every source is licensed for commercial use with attribution.
  • An announced or permitted build is not a contract, an open bid or a purchase order.
  • Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.

Cite or correct this record

Kapwork Grow, “AWS Wallula Gap Campus”, https://kapwork.com/grow/directory/datacenters/aws-wallula-gap-campus-wa-dc_8d34838854bd, materially updated Sep 24, 2026.

Report an error in this record and we will check it against the cited sources.

An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.