Skip to content
Data center buildProposed

Beltline Energy Yukon Data Center

Beltline EnergyYukon, Canadian County, OKUpdated

Beltline Energy has proposed a 500 MW data center in Canadian County, Oklahoma (proposed). One source reports this facility in the Kapwork Grow tracker.

Capacity
500 MW
Investment
$1B

Who's on this build

Named in the cited sources. No source reports who builds it.

Timeline

Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.

  1. Today

    Proposed

    Last material change Sep 24, 2026.

  2. 13 mo ago

    Announced

Reported updates without an event date

Record quality

Datasets
1
Location
Approximate: city centroid
Summary
From published records
Source as of
Last material change

Site and infrastructure

SC Server CountryKW Kapwork Grow tracker record

Status

Operator
Beltline EnergyOperator · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0793
Stage
ProposedStage · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0793
Facility type
EnterpriseFacility type · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 120614240785305

Scale

Reported capacity
500 MWReported capacity · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0793
Reported investment
$1BReported investment · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 120614240785305

Reported dates

Announced
2025-08Announced · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0793

Site

City
YukonCity · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0793
County
Canadian CountyCounty · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0793
State
OklahomaState · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0793
Location precision
Approximate: city centroidLocation precision · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 120614240785305

Sources, method and limits

Show 1 sourceHide

What each source reports

What each source reports
DatasetReported nameReported statusReported MW
Server CountryBeltline Energy Yukon Data CenterProposed500 MW

Sources and evidence

  1. SC
    Server Country project record (CC BY 4.0)As of: Sep 24, 2026 · Record: 0793
  2. KW

Limitations and interpretation

  • This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
  • Sources on this record: Server Country, https://servercountry.org/data/ (CC BY 4.0). Every source is licensed for commercial use with attribution.
  • An announced or permitted build is not a contract, an open bid or a purchase order.
  • Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.

Cite or correct this record

Kapwork Grow, “Beltline Energy Yukon Data Center”, https://kapwork.com/grow/directory/datacenters/beltline-energy-yukon-data-center-ok-dc_6db2b0fa1399, materially updated Sep 24, 2026.

Report an error in this record and we will check it against the cited sources.

An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.

More builds

Kapwork Grow

Every data center build in the directory, in one place.

Search by company, place or trade.

Browse all builds