Big Beaver Campus
Switch has proposed a data center in Beaver County, Pennsylvania (proposed). One source reports this facility in the Kapwork Grow tracker.
- Investment
- $1.4B
- Site
- 382 acres
- Reported jobs
- 100
Who's on this build
Named in the cited sources. No source reports who builds it.
- Other Switch builds
Operator
Switch
Timeline
Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.
- Today
Proposed
Last material change Sep 24, 2026.
- 5 mo ago
Announced
- 5 mo ago
Event date: · First observed: Not reported
Record quality
- Datasets
- 1
- Location
- Street address reported
- Summary
- From published records
- Source as of
- Last material change
Site and infrastructure
CA Compute AtlasKW Kapwork Grow tracker record
Status
- Operator
- Switch
- Stage
- Proposed
- Facility type
- Colocation
Scale
- Reported investment
- $1.4B
- Site area
- 382 acres
- Reported jobs
- 100
Reported dates
- Announced
- 2026-04-30Reported date — see the source for the event evidenced.
Site
- City
- Big Beaver
- County
- Beaver
- State
- Pennsylvania
- Location precision
- Street address reported
- Community response
- Local opposition reported
Sources, method and limits
Show 4 sourcesHide
What each source reports
| Dataset | Reported name | Reported status | Reported MW |
|---|---|---|---|
| Compute Atlas | Big Beaver Campus | Proposed | Not reported |
Sources and evidence
- CACompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Jul 25, 2026 · Record: switch-big-beaver-pa
- CASwitch (cited by Compute Atlas)As of: Jul 17, 2026
- CAData Center Dynamics (cited by Compute Atlas)As of: Jul 17, 2026
- CAReport cited by Compute AtlasAs of: Jul 25, 2026
- KWKapwork Grow tracker record, merged from the sources listed here (free account)As of: Sep 23, 2026 · Record: 216251570252475
Limitations and interpretation
- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.
Cite or correct this record
Kapwork Grow, “Big Beaver Campus”, https://kapwork.com/grow/directory/datacenters/big-beaver-campus-pa-dc_c4adfe06eabb, materially updated Sep 24, 2026.
Report an error in this record and we will check it against the cited sources.
An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.
More builds
- 1205 Commonwealth Dr. Data Center (former Pennhurst Asylum)Pennsylvania
- 2100 Renaissance Blvd. Data Center (MLP Ventures)Pennsylvania
- 216 Greenfield Road (Chirisa Technology Parks)Pennsylvania
- 2201, 2301, 2501, 2701, & 2901 Renaissance Blvd. Data Center (MLP Ventures)Pennsylvania
- 3200 Horizon Dr. Data Center (MLP Ventures)Pennsylvania
Kapwork Grow
Every data center build in the directory, in one place.
Search by company, place or trade.