Switch Citadel Campus (Tahoe Reno)
Switch is expanding a 2000 MW data center in Storey County, Nevada (expanding). One source reports this facility in the Kapwork Grow tracker.
- Capacity
- 2000 MW
- Investment
- $4.6B ($4.55B)
- Building area
- 1.3M sq ft (1,300,000 sq ft)
Who's on this build
Named in the cited sources. No source reports who builds it.
- Other Switch builds
Operator
Switch
Schedule
Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.
- Today
Expanding
Last material change Sep 24, 2026.
- ~2 yr ago
Expected completionPlanned
- ~6 yr ago
Construction start
- ~10 yr ago
Announced
- ~10 yr ago
Event date: · First observed: Not reported
Reported updates without an event date
Reported for 2024-05.
Event date: Not reported · First observed: Not reported
Reported for 2020-11.
Event date: Not reported · First observed: Not reported
Record quality
- Datasets
- 1
- Summary
- From published records
- Source as of
- Last material change
Site and infrastructure
SC Server CountryKW Kapwork Grow tracker record
Status
- Operator
- Switch
- Tenants
- global e-commerce client, Fortune 100 semiconductor client, eBay
- Stage
- Expanding
- Facility type
- Colocation
Scale
- Reported capacity
- 2000 MW
- Reported investment
- $4.55B
- Reported building area
- 1,300,000 sq ft
Reported dates
- Announced
- 2017-02-14Reported date — see the source for the event evidenced.
- Construction start reported
- 2020-11
- Expected completion
- 2024-05
Site
- City
- Reno/Sparks
- County
- Storey County
- State
- Nevada
Permits and public records
- Incentives reported
- Property Tax Abatement; Sales Tax Exemption; Other
Sources, method and limits
Show 1 sourceHide
What each source reports
| Dataset | Reported name | Reported status | Reported MW |
|---|---|---|---|
| Server Country | Switch Citadel Campus (Tahoe Reno) | Expanding | 2000 MW |
Sources and evidence
- SCServer Country project record (CC BY 4.0)As of: Sep 24, 2026 · Record: 0303
- KWKapwork Grow tracker record, merged from the sources listed here (free account)As of: Sep 23, 2026 · Record: 57910569876749
Limitations and interpretation
- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Server Country, https://servercountry.org/data/ (CC BY 4.0). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.
Cite or correct this record
Kapwork Grow, “Switch Citadel Campus (Tahoe Reno)”, https://kapwork.com/grow/directory/datacenters/switch-citadel-campus-tahoe-reno-nv-dc_34ab5af23d0d, materially updated Sep 24, 2026.
Report an error in this record and we will check it against the cited sources.
An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.
More builds
Kapwork Grow
Every data center build in the directory, in one place.
Search by company, place or trade.