Blackstone-QTS Northeastern Pennsylvania Data Centers
QTS has proposed a data center in Luzerne County, Pennsylvania (proposed). One source reports this facility in the Kapwork Grow tracker.
- Investment
- $10B
- Reported jobs
- 3,000
Who's on this build
Named in the cited sources. No source reports who builds it.
- Other QTS builds
Operator
QTS
Timeline
Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.
- in 2 yr
Construction start
- Today
Proposed
Last material change Sep 24, 2026.
- 14 mo ago
Announced
- 14 mo ago
Event date: · First observed: Not reported
Reported updates without an event date
Reported for 2028.
Event date: Not reported · First observed: Not reported
Record quality
- Datasets
- 1
- Summary
- From published records
- Source as of
- Last material change
Site and infrastructure
SC Server CountryKW Kapwork Grow tracker record
Status
- Operator
- QTS
- Stage
- Proposed
- Facility type
- Colocation
Scale
- Reported investment
- $10B
- Reported jobs
- 3,000
Reported dates
- Announced
- 2025-07-15Reported date — see the source for the event evidenced.
- Construction start reported
- 2028
Site
- City
- Salem Township
- County
- Luzerne County
- State
- Pennsylvania
Permits and public records
- Incentives reported
- Sales Tax Exemption
Sources, method and limits
Show 1 sourceHide
What each source reports
| Dataset | Reported name | Reported status | Reported MW |
|---|---|---|---|
| Server Country | Blackstone-QTS Northeastern Pennsylvania Data Centers | Proposed | Not reported |
Sources and evidence
- SCServer Country project record (CC BY 4.0)As of: Sep 24, 2026 · Record: 0431
- KWKapwork Grow tracker record, merged from the sources listed here (free account)As of: Sep 23, 2026 · Record: 229743576923023
Limitations and interpretation
- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Server Country, https://servercountry.org/data/ (CC BY 4.0). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.
Cite or correct this record
Kapwork Grow, “Blackstone-QTS Northeastern Pennsylvania Data Centers”, https://kapwork.com/grow/directory/datacenters/blackstone-qts-northeastern-pennsylvania-data-centers-pa-dc_d0f3584abb8f, materially updated Sep 24, 2026.
Report an error in this record and we will check it against the cited sources.
An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.
More builds
- 1205 Commonwealth Dr. Data Center (former Pennhurst Asylum)Pennsylvania
- 2100 Renaissance Blvd. Data Center (MLP Ventures)Pennsylvania
- 216 Greenfield Road (Chirisa Technology Parks)Pennsylvania
- 2201, 2301, 2501, 2701, & 2901 Renaissance Blvd. Data Center (MLP Ventures)Pennsylvania
- 3200 Horizon Dr. Data Center (MLP Ventures)Pennsylvania
Kapwork Grow
Every data center build in the directory, in one place.
Search by company, place or trade.