Skip to content
Data center buildProposed

Chestnut River Holyoke Data Center (former Hampden Papers complex)

Chestnut River Power and InfrastructureHolyoke, Hampden County, MAUpdated

Chestnut River Power and Infrastructure has proposed a 20 MW data center in Hampden County, Massachusetts (proposed). One source reports this facility in the Kapwork Grow tracker.

Capacity
20 MW
Investment
$200M

Who's on this build

Named in the cited sources. No source reports who builds it.

  • Operator

    Chestnut River Power and Infrastructure

Timeline

Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.

  1. Today

    Proposed

    Last material change Sep 24, 2026.

  2. 3 mo ago

    Reported as announced

    Event date: · First observed: Not reported

  3. 3 mo ago

    Announced

Reported updates without an event date

Record quality

Datasets
1
Location
Street address reported
Summary
From published records
Source as of
Last material change

Site and infrastructure

CA Compute AtlasKW Kapwork Grow tracker record

Status

Operator
Chestnut River Power and InfrastructureOperator · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 15, 2026 · Record: chestnut-river-holyoke-ma
Stage
ProposedStage · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 15, 2026 · Record: chestnut-river-holyoke-ma
Facility type
EnterpriseFacility type · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 276708662709896

Scale

Reported capacity
20 MWReported capacity · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 15, 2026 · Record: chestnut-river-holyoke-ma
Reported investment
$200MReported investment · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 276708662709896

Reported dates

Announced
2026-06Announced · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 15, 2026 · Record: chestnut-river-holyoke-ma

Site

City
HolyokeCity · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 15, 2026 · Record: chestnut-river-holyoke-ma
County
HampdenCounty · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 15, 2026 · Record: chestnut-river-holyoke-ma
State
MassachusettsState · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 15, 2026 · Record: chestnut-river-holyoke-ma
Location precision
Street address reportedLocation precision · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 276708662709896

Sources, method and limits

Show 4 sourcesHide

What each source reports

What each source reports
DatasetReported nameReported statusReported MW
Compute AtlasChestnut River Holyoke Data Center (former Hampden Papers complex)Proposed20 MW

Sources and evidence

  1. CA
    Compute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Sep 15, 2026 · Record: chestnut-river-holyoke-ma
  2. CA
  3. CA
  4. CA
  5. KW

Limitations and interpretation

  • This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
  • Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0). Every source is licensed for commercial use with attribution.
  • An announced or permitted build is not a contract, an open bid or a purchase order.
  • Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.

Cite or correct this record

Kapwork Grow, “Chestnut River Holyoke Data Center (former Hampden Papers complex)”, https://kapwork.com/grow/directory/datacenters/chestnut-river-holyoke-data-center-former-hampden-papers-complex-ma-dc_fbaa418c0e88, materially updated Sep 24, 2026.

Report an error in this record and we will check it against the cited sources.

An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.