Servistar Realties Westfield Data Center Campus
Servistar Realties has proposed a 42 MW data center in Hampden County, Massachusetts (proposed). 2 sources report this facility in the Kapwork Grow tracker.
- Capacity
- 42 MW
- Investment
- $4B
- Building area
- 3 sq ft
- Expected completion
- 2038
Who's on this build
Named in the cited sources. No source reports who builds it.
Operator
Servistar Realties
Utility
City of Westfield
Schedule
Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.
- in 12 yr
Expected completionPlanned
- this year
Construction start
- Today
Proposed
Last material change Sep 24, 2026.
- ~5 yr ago
Announced
Reported updates without an event date
Reported for 2038.
Event date: Not reported · First observed: Not reported
Reported for 2026.
Event date: Not reported · First observed: Not reported
Reported for 2021-08.
Event date: Not reported · First observed: Not reported
Record quality
- Datasets
- 2, figures differ
- Location
- Street address reported
- Summary
- From published records
- Source as of
- Last material change
Site and infrastructure
CA Compute AtlasSC Server CountryKW Kapwork Grow tracker record
Status
- Operator
- Servistar Realties
- Stage
- Proposed
- Facility type
- Enterprise
Scale
- Reported capacity
- 42 MW
- Capacity as the sources range
- 42 to 274 MW
- Reported investment
- $4B
- Reported building area
- 3 sq ft
Reported dates
- Announced
- 2021-08
- Construction start reported
- 2026
- Expected completion
- 2038
Site
- City
- Westfield
- County
- Hampden
- State
- Massachusetts
- Location precision
- Street address reported
- Community response
- Local opposition reported
Power and cooling
- Utility
- City of Westfield
Permits and public records
- Incentives reported
- Pilot; $360,000,000
Sources, method and limits
Show 8 sourcesHide
What each source reports
| Dataset | Reported name | Reported status | Reported MW |
|---|---|---|---|
| Compute Atlas | Servistar Realties Westfield Data Center Campus | Proposed | 42 MW |
| Server Country | Westfield Data Center Campus (Servistar Realties) | Proposed | 274 MW |
Sources and evidence
- CACompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Jul 26, 2026 · Record: servistar-westfield-ma
- CABaxtel (cited by Compute Atlas)As of: Jul 17, 2026
- CANBC Boston (cited by Compute Atlas)As of: Jul 17, 2026
- CAThe Shoestring (cited by Compute Atlas)As of: Jul 17, 2026
- CAThe Boston Globe (cited by Compute Atlas)As of: Jul 17, 2026
- CAOak Ridge National Laboratory (ORNL) / HIFLD (cited by Compute Atlas)As of: Jul 23, 2026
- CAReport cited by Compute AtlasAs of: Jul 26, 2026
- SCServer Country project record (CC BY 4.0)As of: Sep 24, 2026 · Record: 0229
- KWKapwork Grow tracker record, merged from the sources listed here (free account)As of: Sep 23, 2026 · Record: 60633776897409
Limitations and interpretation
- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0) · Server Country, https://servercountry.org/data/ (CC BY 4.0). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.
Cite or correct this record
Kapwork Grow, “Servistar Realties Westfield Data Center Campus”, https://kapwork.com/grow/directory/datacenters/servistar-realties-westfield-data-center-campus-ma-dc_372566bbbd81, materially updated Sep 24, 2026.
Report an error in this record and we will check it against the cited sources.
An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.
More builds
Kapwork Grow
Every data center build in the directory, in one place.
Search by company, place or trade.