Diamond Farms (Gateway Digital Campus)
Provident Data Centers has proposed a data center in Franklin County, Missouri (proposed). 2 sources report this facility in the Kapwork Grow tracker.
- Site
- 600 acres
- Reported jobs
- 250
Who's on this build
Named in the cited sources. No source reports who builds it.
Operator
Provident Data Centers
Timeline
Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.
- Today
Proposed
Last material change Sep 24, 2026.
- 5 mo ago
Announced
- 5 mo ago
Event date: · First observed: Not reported
Record quality
- Datasets
- 2, figures differ
- Location
- Street address reported
- Summary
- From published records
- Source as of
- Last material change
Site and infrastructure
CA Compute AtlasSC Server CountryKW Kapwork Grow tracker record
Status
- Operator
- Provident Data Centers
- Stage
- Proposed
- Facility type
- AI data center
Scale
- Site area
- 600 acres
- Reported jobs
- 250
Reported dates
- Announced
- 2026-04-23Reported date — see the source for the event evidenced.
Site
- City
- Villa Ridge
- County
- Franklin
- State
- Missouri
- Location precision
- Street address reported
Power and cooling
- AI workload
- AI or machine-learning workload reported
Sources, method and limits
Show 4 sourcesHide
What each source reports
| Dataset | Reported name | Reported status | Reported MW |
|---|---|---|---|
| Compute Atlas | Diamond Farms (Gateway Digital Campus) | Proposed | Not reported |
| Server Country | Gateway Digital Campus (Diamond Farms) | Proposed | Not reported |
Sources and evidence
- CACompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Aug 24, 2026 · Record: diamond-farms-gateway-digital-villa-ridge-mo
- CAKSDK (cited by Compute Atlas)As of: Aug 24, 2026
- CAThe Missouri Times (cited by Compute Atlas)As of: Aug 24, 2026
- SCServer Country project record (CC BY 4.0)As of: Sep 24, 2026 · Record: 0749
- KWKapwork Grow tracker record, merged from the sources listed here (free account)As of: Sep 23, 2026 · Record: 196669072142111
Limitations and interpretation
- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0) · Server Country, https://servercountry.org/data/ (CC BY 4.0). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.
Cite or correct this record
Kapwork Grow, “Diamond Farms (Gateway Digital Campus)”, https://kapwork.com/grow/directory/datacenters/diamond-farms-gateway-digital-campus-mo-dc_b2de962eef1f, materially updated Sep 24, 2026.
Report an error in this record and we will check it against the cited sources.
An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.
More builds
Kapwork Grow
Every data center build in the directory, in one place.
Search by company, place or trade.