Skip to content
Data center buildProposed2 datasets report

Diamond Farms (Gateway Digital Campus)

Provident Data CentersVilla Ridge, Franklin County, MOUpdated

Provident Data Centers has proposed a data center in Franklin County, Missouri (proposed). 2 sources report this facility in the Kapwork Grow tracker.

Site
600 acres
Reported jobs
250

Who's on this build

Named in the cited sources. No source reports who builds it.

  • Operator

    Provident Data Centers

Timeline

Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.

  1. Today

    Proposed

    Last material change Sep 24, 2026.

  2. 5 mo ago

    Announced

  3. 5 mo ago

    Reported as announced

    Event date: · First observed: Not reported

Record quality

Datasets
2, figures differ
Location
Street address reported
Summary
From published records
Source as of
Last material change

Site and infrastructure

CA Compute AtlasSC Server CountryKW Kapwork Grow tracker record

Status

Operator
Provident Data CentersOperator · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Aug 24, 2026 · Record: diamond-farms-gateway-digital-villa-ridge-moOperator · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0749
Stage
ProposedStage · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Aug 24, 2026 · Record: diamond-farms-gateway-digital-villa-ridge-moStage · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0749
Facility type
AI data centerFacility type · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 196669072142111

Scale

Site area
600 acresSite area · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 196669072142111
Reported jobs
250Reported jobs · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 196669072142111

Reported dates

Announced
2026-04-23Announced · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Aug 24, 2026 · Record: diamond-farms-gateway-digital-villa-ridge-moReported date — see the source for the event evidenced.

Site

City
Villa RidgeCity · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Aug 24, 2026 · Record: diamond-farms-gateway-digital-villa-ridge-moCity · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0749
County
FranklinCounty · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Aug 24, 2026 · Record: diamond-farms-gateway-digital-villa-ridge-moCounty · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0749
State
MissouriState · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Aug 24, 2026 · Record: diamond-farms-gateway-digital-villa-ridge-moState · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0749
Location precision
Street address reportedLocation precision · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 196669072142111

Power and cooling

AI workload
AI or machine-learning workload reportedAI workload · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 196669072142111

Sources, method and limits

Show 4 sourcesHide

What each source reports

What each source reports
DatasetReported nameReported statusReported MW
Compute AtlasDiamond Farms (Gateway Digital Campus)ProposedNot reported
Server CountryGateway Digital Campus (Diamond Farms)ProposedNot reported

Sources and evidence

  1. CA
    Compute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Aug 24, 2026 · Record: diamond-farms-gateway-digital-villa-ridge-mo
  2. CA
  3. CA
  4. SC
    Server Country project record (CC BY 4.0)As of: Sep 24, 2026 · Record: 0749
  5. KW

Limitations and interpretation

  • This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
  • Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0) · Server Country, https://servercountry.org/data/ (CC BY 4.0). Every source is licensed for commercial use with attribution.
  • An announced or permitted build is not a contract, an open bid or a purchase order.
  • Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.

Cite or correct this record

Kapwork Grow, “Diamond Farms (Gateway Digital Campus)”, https://kapwork.com/grow/directory/datacenters/diamond-farms-gateway-digital-campus-mo-dc_b2de962eef1f, materially updated Sep 24, 2026.

Report an error in this record and we will check it against the cited sources.

An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.

More builds

Kapwork Grow

Every data center build in the directory, in one place.

Search by company, place or trade.

Browse all builds