Skip to content
Data center buildUnder construction

EdgeCore Reno Data Center Campus

EdgeCoreMcCarran, Storey County, NVUpdated

EdgeCore is building a 216 MW data center in Storey County, Nevada (under construction). One source reports this facility in the Kapwork Grow tracker.

Capacity
216 MW
Site
56 acres

Who's on this build

Named in the cited sources. No source reports who builds it.

Timeline

Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.

  1. Today

    Under construction

    Last material change Sep 24, 2026.

  2. 8 mo ago

    Construction start

  3. ~3 yr ago

    Reported as announced

    Event date: · First observed: Not reported

  4. ~3 yr ago

    Announced

Reported updates without an event date

Record quality

Datasets
1
Location
Street address reported
Summary
From published records
Source as of
Last material change

Site and infrastructure

CA Compute AtlasKW Kapwork Grow tracker record

Status

Operator
EdgeCoreOperator · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 11, 2026 · Record: edgecore-reno-campus-storey-county-nv
Stage
Under constructionStage · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 11, 2026 · Record: edgecore-reno-campus-storey-county-nv
Facility type
AI data centerFacility type · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 202774175778238

Scale

Reported capacity
216 MWReported capacity · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 11, 2026 · Record: edgecore-reno-campus-storey-county-nv
Site area
56 acresSite area · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 202774175778238

Reported dates

Announced
2023-08Announced · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 11, 2026 · Record: edgecore-reno-campus-storey-county-nv
Construction start reported
2026-01Construction start reported · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 11, 2026 · Record: edgecore-reno-campus-storey-county-nv

Site

City
McCarranCity · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 11, 2026 · Record: edgecore-reno-campus-storey-county-nv
County
StoreyCounty · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 11, 2026 · Record: edgecore-reno-campus-storey-county-nv
State
NevadaState · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 11, 2026 · Record: edgecore-reno-campus-storey-county-nv
Location precision
Street address reportedLocation precision · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 202774175778238

Power and cooling

Cooling
HybridCooling · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 202774175778238
AI workload
Confirmed AI or machine-learning workloadAI workload · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 11, 2026 · Record: edgecore-reno-campus-storey-county-nv

Sources, method and limits

Show 6 sourcesHide

What each source reports

What each source reports
DatasetReported nameReported statusReported MW
Compute AtlasEdgeCore Reno Data Center CampusUnder construction216 MW

Sources and evidence

  1. CA
    Compute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Sep 11, 2026 · Record: edgecore-reno-campus-storey-county-nv
  2. CA
  3. CA
  4. CA
  5. CA
  6. CA
  7. KW

Limitations and interpretation

  • This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
  • Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0). Every source is licensed for commercial use with attribution.
  • An announced or permitted build is not a contract, an open bid or a purchase order.
  • Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.

Cite or correct this record

Kapwork Grow, “EdgeCore Reno Data Center Campus”, https://kapwork.com/grow/directory/datacenters/edgecore-reno-data-center-campus-nv-dc_b86c0ab785be, materially updated Sep 24, 2026.

Report an error in this record and we will check it against the cited sources.

An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.

More builds

Kapwork Grow

Every data center build in the directory, in one place.

Search by company, place or trade.

Browse all builds