Skip to content
Data center buildProposed2 datasets report

EdgeCore Culpeper Data Center Campus

EdgeCoreCulpeper, Culpeper County, VAUpdated

EdgeCore has proposed a 216 MW data center in Culpeper County, Virginia (proposed). 2 sources report this facility in the Kapwork Grow tracker.

Capacity
216 MW
Building area
1.4M sq ft (1,400,000 sq ft)
Site
120 acres
Expected completion
Jun 2029 (2029-06)
IT load
196 MW

Who's on this build

Named in the cited sources. No source reports who builds it.

Schedule

Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.

  1. in ~3 yr

    Expected completionPlanned

  2. Today

    Proposed

    Last material change Sep 24, 2026.

  3. 5 mo ago

    Construction start

  4. 5 mo ago

    Construction start reported

    Event date: · First observed: Not reported

  5. ~2 yr ago

    Announced

  6. ~2 yr ago

    Reported as announced

    Event date: · First observed: Not reported

Reported updates without an event date

Record quality

Datasets
2, figures differ
Location
Street address reported
Summary
From published records
Source as of
Last material change

Site and infrastructure

CA Compute AtlasSC Server CountryKW Kapwork Grow tracker record

Status

Operator
EdgeCoreOperator · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Aug 27, 2026 · Record: edgecore-culpeper-tech-zone-vaOperator · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0516
Stage
ProposedStage · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Aug 27, 2026 · Record: edgecore-culpeper-tech-zone-va
Facility type
EnterpriseFacility type · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 68870700488642

Scale

Reported capacity
216 MWReported capacity · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Aug 27, 2026 · Record: edgecore-culpeper-tech-zone-va
Capacity as the sources range
196 to 216 MWCapacity as the sources range · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Aug 27, 2026 · Record: edgecore-culpeper-tech-zone-vaCapacity as the sources range · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0516
Reported IT load
196 MWReported IT load · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 68870700488642
Reported building area
1,400,000 sq ftReported building area · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 68870700488642
Site area
120 acresSite area · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 68870700488642
Reported jobs
40Reported jobs · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 68870700488642

Reported dates

Announced
2024-07-18Announced · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Aug 27, 2026 · Record: edgecore-culpeper-tech-zone-vaReported date — see the source for the event evidenced.
Construction start reported
2026-04-22Construction start reported · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0516Reported date — see the source for the event evidenced.
Expected completion
2029-06Expected completion · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0516

Site

City
CulpeperCity · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Aug 27, 2026 · Record: edgecore-culpeper-tech-zone-vaCity · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0516
County
CulpeperCounty · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Aug 27, 2026 · Record: edgecore-culpeper-tech-zone-vaCounty · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0516
State
VirginiaState · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Aug 27, 2026 · Record: edgecore-culpeper-tech-zone-vaState · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0516
Location precision
Street address reportedLocation precision · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 68870700488642

Power and cooling

Utility
Rappahannock Electric CooperativeUtility · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 68870700488642
Power source
Grid powerPower source · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 68870700488642
Cooling
Closed loopCooling · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 68870700488642

Permits and public records

Incentives reported
Property Tax AbatementIncentives reported · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 68870700488642

Sources, method and limits

Show 3 sourcesHide

What each source reports

What each source reports
DatasetReported nameReported statusReported MW
Compute AtlasEdgeCore Culpeper Data Center CampusProposed216 MW
Server CountryEdgeCore Culpeper CampusUnder construction196 MW

Sources and evidence

  1. CA
    Compute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Aug 27, 2026 · Record: edgecore-culpeper-tech-zone-va
  2. CA
  3. SC
    Server Country project record (CC BY 4.0)As of: Sep 24, 2026 · Record: 0516
  4. KW

Limitations and interpretation

  • This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
  • Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0) · Server Country, https://servercountry.org/data/ (CC BY 4.0). Every source is licensed for commercial use with attribution.
  • An announced or permitted build is not a contract, an open bid or a purchase order.
  • Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.

Cite or correct this record

Kapwork Grow, “EdgeCore Culpeper Data Center Campus”, https://kapwork.com/grow/directory/datacenters/edgecore-culpeper-data-center-campus-va-dc_3ea335a357c2, materially updated Sep 24, 2026.

Report an error in this record and we will check it against the cited sources.

An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.

More builds

Kapwork Grow

Every data center build in the directory, in one place.

Search by company, place or trade.

Browse all builds