AWS Mattermeade Tech Campus
Amazon Web Services has proposed a 770 MW data center in Caroline County, Virginia (proposed). 2 sources report this facility in the Kapwork Grow tracker.
- Capacity
- 770 MW
- Site
- 1,143 acres
Who's on this build
Named in the cited sources. No source reports who builds it.
- Other Amazon Web Services builds
Operator
Amazon Web Services
Timeline
Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.
- Today
Proposed
Last material change Sep 24, 2026.
- 2 mo ago
Event date: · First observed: Not reported
- last year
Announced
Reported updates without an event date
Reported for 2025-02.
Event date: Not reported · First observed: Not reported
Reported for 2025.
Event date: Not reported · First observed: Not reported
Record quality
- Datasets
- 1
- Location
- Site footprint confirmed
- Summary
- From published records
- Source as of
- Last material change
Site and infrastructure
CA Compute AtlasPE Public Evidence ProjectKW Kapwork Grow tracker record
Status
- Operator
- Amazon Web Services
- Stage
- Proposed
- Facility type
- AI data center
Scale
- Reported capacity
- 770 MW
- Site area
- 1,143 acres
Reported dates
- Announced
- 2025
Site
- City
- Bowling Green
- County
- Caroline
- State
- Virginia
- Location precision
- Site footprint confirmed
Power and cooling
- Power source
- Grid power
- AI workload
- Confirmed AI or machine-learning workload
Permits and public records
- Government records on file
- 1
Sources, method and limits
Show 6 sourcesHide
What each source reports
| Dataset | Reported name | Reported status | Reported MW |
|---|---|---|---|
| Compute Atlas | AWS Mattermeade Tech Campus | Proposed | 770 MW |
Sources and evidence
- CACompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Jul 25, 2026 · Record: aws-mattermeade-caroline-va
- CAData Center Dynamics (cited by Compute Atlas)As of: Jul 7, 2026
- CAData Center Frontier (cited by Compute Atlas)As of: Jul 17, 2026
- CASpotsylvania County, VA (cited by Compute Atlas)As of: Jul 17, 2026
- CAReport cited by Compute AtlasAs of: Jul 25, 2026
- PEPublic Evidence Project: Permit from Spotsylvania County, VAAs of: Aug 6, 2026 · Record: source-aws-mattermeade-caroline-va
- KWKapwork Grow tracker record, merged from the sources listed here (free account)As of: Sep 23, 2026 · Record: 181572750683665
Limitations and interpretation
- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0) · Public Evidence Project, U.S. Data Center Public Records Dataset, https://publicevidence.org/data/national-data-center-public-records (CC BY 4.0). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.
Cite or correct this record
Kapwork Grow, “AWS Mattermeade Tech Campus”, https://kapwork.com/grow/directory/datacenters/aws-mattermeade-tech-campus-va-dc_a523b34e2e11, materially updated Sep 24, 2026.
Report an error in this record and we will check it against the cited sources.
An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.
More builds
Kapwork Grow
Every data center build in the directory, in one place.
Search by company, place or trade.