Fleet Data Centers Storey County Campus (South Valley & Peru Ridge)
Fleet Data Centers is building a 400 MW data center in Storey County, Nevada (under construction). One source reports this facility in the Kapwork Grow tracker.
- Capacity
- 400 MW
- Site
- 769 acres
Who's on this build
Named in the cited sources. No source reports who builds it.
- Other Fleet Data Centers builds
Operator
Fleet Data Centers
Utility
NV Energy
Timeline
Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.
- Today
Under construction
Last material change Sep 24, 2026.
- 4 mo ago
Construction start
- 4 mo ago
Event date: · First observed: Not reported
- 4 mo ago
Announced
Reported updates without an event date
Reported for 2026-05.
Event date: Not reported · First observed: Not reported
Record quality
- Datasets
- 1
- Location
- Street address reported
- Summary
- From published records
- Source as of
- Last material change
Site and infrastructure
CA Compute AtlasKW Kapwork Grow tracker record
Status
- Operator
- Fleet Data Centers
- Stage
- Under construction
- Facility type
- AI data center
Scale
- Reported capacity
- 400 MW
- Site area
- 769 acres
Reported dates
- Announced
- 2026-05
- Construction start reported
- 2026-05-20Reported date — see the source for the event evidenced.
Site
- City
- McCarran
- County
- Storey
- State
- Nevada
- Location precision
- Street address reported
- Community response
- Local opposition reported
Power and cooling
- Utility
- NV Energy
- Power source
- Mixed sources
- AI workload
- Likely AI or machine-learning workload
Sources, method and limits
Show 7 sourcesHide
What each source reports
| Dataset | Reported name | Reported status | Reported MW |
|---|---|---|---|
| Compute Atlas | Fleet Data Centers Storey County Campus (South Valley & Peru Ridge) | Under construction | 400 MW |
Sources and evidence
- CACompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Aug 14, 2026 · Record: fleet-data-centers-storey-county-nv
- CAData Center Dynamics (cited by Compute Atlas)As of: Jul 30, 2026
- CANorthern Nevada Business Weekly (cited by Compute Atlas)As of: Jul 30, 2026
- CANevada Appeal (cited by Compute Atlas)As of: Jul 30, 2026
- CAKOLO 8 News Now (cited by Compute Atlas)As of: Jul 30, 2026
- CACarson Now (cited by Compute Atlas)As of: Aug 14, 2026
- CAThe Nevada Independent (cited by Compute Atlas)As of: Aug 14, 2026
- KWKapwork Grow tracker record, merged from the sources listed here (free account)As of: Sep 23, 2026 · Record: 253960391642444
Limitations and interpretation
- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.
Cite or correct this record
Kapwork Grow, “Fleet Data Centers Storey County Campus (South Valley & Peru Ridge)”, https://kapwork.com/grow/directory/datacenters/fleet-data-centers-storey-county-campus-south-valley-peru-ridge-nv-dc_e6f9c2ee4d4c, materially updated Sep 24, 2026.
Report an error in this record and we will check it against the cited sources.
An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.
More builds
Kapwork Grow
Every data center build in the directory, in one place.
Search by company, place or trade.