Google Stillwater Data Center Campus
Google is building a 270 MW data center in Payne County, Oklahoma (under construction). 2 sources report this facility in the Kapwork Grow tracker.
- Capacity
- 270 MW
- Investment
- $3B
- Building area
- 1.8M sq ft (1,800,000 sq ft)
- Site
- 400 acres
- Expected completion
- 2027
Who's on this build
Named in the cited sources. No source reports who builds it.
- Other Google builds
Operator
Google
Utility
OG&E
Schedule
Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.
- next year
Expected completionPlanned
- Today
Under construction
Last material change Sep 24, 2026.
- 2 mo ago
Construction start
- 2 mo ago
Event date: · First observed: Not reported
- ~1 yr ago
Announced
Reported updates without an event date
Reported for 2027.
Event date: Not reported · First observed: Not reported
Reported for 2025-03.
Event date: Not reported · First observed: Not reported
Record quality
- Datasets
- 2, figures differ
- Location
- Site footprint confirmed
- Summary
- From published records
- Source as of
- Last material change
Site and infrastructure
CA Compute AtlasSC Server CountryKW Kapwork Grow tracker record
Status
- Operator
- Stage
- Under construction
- Facility type
- AI data center
Scale
- Reported capacity
- 270 MWEstimate
- Reported investment
- $3B
- Reported building area
- 1,800,000 sq ft
- Site area
- 400 acres
Reported dates
- Announced
- 2025-03
- Construction start reported
- 2026-07-21Reported date — see the source for the event evidenced.
- Expected completion
- 2027
Site
- City
- Stillwater
- County
- Payne
- State
- Oklahoma
- Location precision
- Site footprint confirmed
- Community response
- Local opposition reported
Power and cooling
- Utility
- OG&E
- Power source
- Grid power
- AI workload
- Confirmed AI or machine-learning workload
Permits and public records
- Incentives reported
- 25-year ad valorem (property-tax) exemption via a PILOT agreement with Stillwater/Payne County taxing jurisdictions (Stillwater Public Schools, Meridian Technology Center, Payne County, county health dept); PILOT payments rise 1%/yr, estimated ~$58.2M over 25 years for the first two phases (Stillwater / Payne County, OK)
Sources, method and limits
Show 9 sourcesHide
What each source reports
| Dataset | Reported name | Reported status | Reported MW |
|---|---|---|---|
| Compute Atlas | Google Stillwater Data Center Campus | Under construction | Not reported |
| Server Country | Google Stillwater Data Center Campus | Under construction | Not reported |
Sources and evidence
- CACompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Sep 14, 2026 · Record: google-stillwater-ok
- CAOklahoma Energy Today (cited by Compute Atlas)As of: Jul 6, 2026
- CAData Center Dynamics (cited by Compute Atlas)As of: Jul 6, 2026
- CAThe Stillwegian (cited by Compute Atlas)As of: Jul 7, 2026
- CAKFOR (cited by Compute Atlas)As of: Jul 7, 2026
- CAStillwater News Press (cited by Compute Atlas)As of: Jul 7, 2026
- CANews 9 (KWTV Oklahoma City) (cited by Compute Atlas)As of: Jul 21, 2026
- CAPublic Radio Tulsa / StateImpact Oklahoma (cited by Compute Atlas)As of: Sep 14, 2026
- SCServer Country project record (CC BY 4.0)As of: Sep 24, 2026 · Record: 0401
- KWKapwork Grow tracker record, merged from the sources listed here (free account)As of: Sep 23, 2026 · Record: 41200647219694
Limitations and interpretation
- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0) · Server Country, https://servercountry.org/data/ (CC BY 4.0). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.
- Capacity is estimated by the tracker from reported floor area at 150 W per square foot.
Cite or correct this record
Kapwork Grow, “Google Stillwater Data Center Campus”, https://kapwork.com/grow/directory/datacenters/google-stillwater-data-center-campus-ok-dc_2578c5f129ee, materially updated Sep 24, 2026.
Report an error in this record and we will check it against the cited sources.
An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.
More builds
Kapwork Grow
Every data center build in the directory, in one place.
Search by company, place or trade.