Hyperscale Data Offshore Bitcoin Mining Pilot
Hyperscale Data, Inc. has proposed a data center in Gulf of Mexico County, Louisiana (proposed). One source reports this facility in the Kapwork Grow tracker.
Who's on this build
Named in the cited sources. No source reports who builds it.
- Other Hyperscale Data, Inc. builds
Operator
Hyperscale Data, Inc.
Schedule
Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.
- Today
Proposed
Last material change Sep 24, 2026.
- ~2 yr ago
Expected completionPlanned
- ~2 yr ago
Announced
- ~2 yr ago
Construction start
Reported updates without an event date
Reported for 2025-02.
Event date: Not reported · First observed: Not reported
Reported for 2024-11.
Event date: Not reported · First observed: Not reported
Reported for 2024-11.
Event date: Not reported · First observed: Not reported
Record quality
- Datasets
- 1
- Summary
- From published records
- Source as of
- Last material change
Site and infrastructure
SC Server CountryKW Kapwork Grow tracker record
Status
- Operator
- Hyperscale Data, Inc.
- Stage
- Proposed
- Facility type
- Enterprise
Reported dates
- Announced
- 2024-11
- Construction start reported
- 2024-11
- Expected completion
- 2025-02
Site
- City
- Offshore
- County
- Gulf of Mexico
- State
- Louisiana
Sources, method and limits
Show 1 sourceHide
What each source reports
| Dataset | Reported name | Reported status | Reported MW |
|---|---|---|---|
| Server Country | Hyperscale Data Offshore Bitcoin Mining Pilot | Proposed | Not reported |
Sources and evidence
- SCServer Country project record (CC BY 4.0)As of: Sep 24, 2026 · Record: 0208
- KWKapwork Grow tracker record, merged from the sources listed here (free account)As of: Sep 23, 2026 · Record: 102364527115319
Limitations and interpretation
- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Server Country, https://servercountry.org/data/ (CC BY 4.0). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.
Cite or correct this record
Kapwork Grow, “Hyperscale Data Offshore Bitcoin Mining Pilot”, https://kapwork.com/grow/directory/datacenters/hyperscale-data-offshore-bitcoin-mining-pilot-la-dc_5d199946bc37, materially updated Sep 24, 2026.
Report an error in this record and we will check it against the cited sources.
An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.
More builds
- Amazon Web Services Bossier Parish Campus (Benton)Louisiana
- Amazon Web Services Caddo Parish Campus (Blanchard)Louisiana
- Amazon Web Services Shreveport Campus (Resilient Technology Park)Louisiana
- Amazon/STACK Northwest Louisiana Data Center CampusesLouisiana
- Applied Digital Delta Forge 1 AI Factory CampusLouisiana
Kapwork Grow
Every data center build in the directory, in one place.
Search by company, place or trade.